Loading...
Riverchase (6.1)-CS 940927Spring Valley Construction Company September 27, 1994 CITY OF COPPELL Engineering Department 255 Parkway Blvd. Coppell, Texas 75019 Attn: Larry Davis Re: Riverchase Plaza Retail Coppell, Texas Dear Mr. Davis: Please find enclosed a check in the amount of $120.00 for the Erosion Control Maintenance Bond on the above referenced project. '~d0~"- This amount represents 100% of the value of this work at the drainage swales f~ar. ~ Feel free to call if I can be of further help. Sincerely, SPRING VALLEY CONSTRUCTION COMPANY Tim Guedry Project Engineer TG/csa Enclosure cc: Fehmi Karahan Mike Gray 94011.7 16475 Dallas Parkway, Suite 620, Dallas, Texas 75248-2670, 214/931-8600, Fax 214/380-9085 Spring Valley Construction Company 16475 Dallas Parkway, Suite 620, Dallas, Texas 75248 Date Pay to the order of: ilIO].S~I~?ll' I:].].].O0?l~:~l~l: OO~, 885 0,' 001 EQUITABLE BANK, Dallas, Tx 75240 Check No. Amount :'Ii: .1. '.~!1 () O Spring Valley Construction Company Operating Account I CASH I RECEIPT IReceived From ACCOUNT ~T. ~A,D ~ '~.,,~ BA, LAHCE ~ DUE OO23725 -'7-7. I,~, -.,~ HOW PAID MONEY O.OER Y