Loading...
Riverchase (6.1)-CS 940318 (2)The City With A Beautiful Future March 18, 1994 P.O. Box 478 Coppell, Texas 75019 214-462-0O22 Mr. Fehmi Karahan, General Partner Riverchase Plaza Ltd. 5429 LBJ Freeway, Suite 340 Dallas, Texas 75240 RE: Riverchase Plaza Development Fee Assessment Dear Mr. Karahan: Enclosed is a copy of the City of Coppell Development Fee Assessment list, along with a copy of the Development Fee Calculations for Riverchase Plaza. Please provide a check made payable to the City of Coppell in the amount of $15,300.00 and forward it to Mr. Alan Johnson, Acting Finance Director, along with a copy of the Fee Assessment List. Please provide our office a copy of the Engineer's Estimate or contract for this project so the construction inspection fee can be verified. By providing a copy of your paid receipt to our office, it will help us to verify payment of the required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please do not hesitate to contact me. Sincerely, Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer CC: Steve Goram, Director of Public Works Alan Johnson, Acting Finance Director Greg Jones, Building Official Doug Stevens, Engineering Technician CITY OF COPPELL DEVELOPMENT FEES Date: Project: March 18,1994 Riverchase Plaza ' ~ TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $ 11,700.00 $ 11,700.00 (10055 due prior to Council Approval) Water Tap Inspection Fee $ 400.00 -0- (100% due at Issuance of Building Permit) Wastewater Impact Fee $ 3,600.00 $ 3,600.00 (100% due prior to Council Approval) Sewer Tap Inspection Fee -0- 4}- (100% due at Issuance of Building Permit) Utility Final Inspection Fee $ 300.00 -0- (100% due at Issuance of Building Permit) Water Meter Fee (Domestic) $ 189.10 -0- (100% due at Issuance of Building Permit) Water Meter Deposit (Non-residential) $140.00 4}- (100% due at Issuance of Building Permit) Water Meter Fee (Irrigation & Fire) $ 5,014.90 -0- (100% due at Issuance of Water Meters) Irrigation Meter Deposit -0- -0- (100% due at Issuance of Water Meters) Street Sign Fee -0- 4}- (100% due prior to Acceptance of Project) Street Light Fee * -0- -0- (100% due prior to Acceptance of Project) Park Fee -0- -0- (50% due prior to Council Approval) (50% due prior to Issuance of Building Permit) Construction Inspection Fee need submittal of 4}- (2% of Project Cost due prior to Preconstr. Mtg.) contracts TOTAL $ 21,344.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $15,300.00 * This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once the plan is submitted, $292.60 per light will be assessed. COPP~r.r.. PUBLIC WORKS DATE March 18, 1994 Engineering Department l~;bllc Works Staff~ Revised Development Fees for RtYer.h~se Pla~a The following revised fees should be assessed and collected on the above referenced project. Water Impa~t Fee; 1,,, - 2" Domestic Meter/s 1 ,,, - .. 1%".. Irrigation Meter/s -- 5_.~ ESU's 2 - _ .... ~" Fireltne Meter/s - ~i ESU's Total 1~ ESU's ~ $650.00 ea ~ S li._zO0.O0 100% due prior to Council approval of the final plat. - Domestic Meter/s = Total ESU's ~ $225.00 ea - 100% due prior to Council approval of final Wa~tewater Impact ~ - 2",,, Total 8 =.. ESU ' s ~:l a t . Domestic Meter/s = 8! ESU'S ESU'$ ~ $450.00 ed --_ $3.[600.00 100% due prior to Council approval of ~he final plat. WmterTmp Xn~=tion Fee ..... 4 Connections @ $I00.00 each - $_400.00~ 100% due prior to issuance of building permit for residential. (or in the ~a~e of multi-family, commercial, retail, industrial, fee is due prior to issuance of meter). . , 03/1~/94 11:25 002 Connection~ g $100.00 each - ~ due ~ior to issuance of building ~rmit~. (Residential only) Utility Ftn~! Zz~p~ctlon Fee (Ail Develop~ent) ..~ lots ~ $$Q.. O0/lot = $ ,.300. O0 ~ 100% due prior Co issuance of building permit. .,_,1 - Z" Domestic/Fire Meters 100% due prior to issuance of building permi~ for residential only. Ail other development fees are due prior to ~ssuance of meter/s. water Meter Fee (Zrrl~stion/Fireline) Irrigation Meter/s ~ $ 210.70 Ftreline Neter/s ~ $ 2,402.i10 ea i00% due prior to issuance of water metor/~. Water Meter Deposit (Residential) Meters ~ $30~Q~ ea . - $ 100% due prior to issuance of building permit. W~ter ~eterDeposit (Multi-Family or Hon-Res~ 4 .. Meters ~ _~ = $ 140.00 ...... 100% due prior to issuance of wator meters. Irri~eti~n Meter Deposit Meters ~ $35,00 em .... - $ 100% due prior to issuance of water metems. ,dential)