Loading...
Riverchase (6.1)-CS 931216P & Z HEARING DATE: C. C. HEARING DATE: CITY OF COPPELL PLANNING DEPARTMENT STAFF REPORT CASF~; River~hase PlaT~, Preliminary_ Plat December 16, 1993 January 11, 1994 LOCATION: Northeast comer of Belt Line Road and MacArthur Blvd. SIZE OF AREA: 8.55 acres to be subdivided into six pad sites CURRENT ZONING: R, Retail REQUEST: Approval of preliminary plat to create six pad sites on 8.55 acres of land APPLICANT: Riverchase Plaza, Ltd (Owner) 5501 LBJ Freeway, Suite 905 Dallas, Tx 75240 239-6966 Winklemann and Assoc. (Engineer) 12800 Hillcrest, g200 Dallas, Tx. 75230 490-7090 HISTORY: There has been no recent platting history on the subject tract TRANSPORTATION: MacArthur Blvd. is a P6D, divided six-lane thoroughfare, contained within a 110 foot r.o.w.; Beltline Road is a P6D east of MacArthur built to standard in a 120 foot r.o.w. Another point of access to this property is Riverchase Blvd., a C4U street, 4 lanes built to standard. Item 17 SURROUNDING LAND USE & ZONING: North - Riverchase golf course; SF-12 SUP South - Commercial development; LI East - Vacant; MF-2 West - Vacant; MF-2 (plat pending consideration) COMPREHENSIVE PLAN: The Plan shows this tract to be utilized for commercial development ANALYSIS: Because this land is zoned for commercial use, the Plan calls for it to be u 'tflized for commercial use, and the applicant is proposing commercial use, staff is in general agreement with the request. However, the landscaping guidelines called out in plat approval have not been met for the MacArthur primary image zone, and minor alterations need to be made prior to approval including: the proposed 15 foot utility easement south of Riverchase Drive should be a minimum 20 foot wide a more detailed drainage study will be required before a final plat can be reviewed because of traffic concerns expressed by Engineering, the applicant is requested to undertake a traffic study (not u~like the one undertaken when Boston Chicken was contemplating a move west of MacArthur, south of this area). Staff's concerns include: vehicles wanting to go south on MacArthur must make a u- turn at Riverehase or the existing median, OR will have to exit on Riverehase and go through the MacArthur/Riverehase intersection the overall ingress/egress to/from the property median reeonfiguration If the applicant can n~t provide the information which will make Engineering comfortable with the traffic flow, and if we do not have a landscape plan to review and comment upon before the Commission meeting, staff would recommend that the plat be denied. If these issues are addressed satisfactorily prior to the Commission meeting, approval would be in order. 1) Approve the Preliminary Plat request 2) Deny the Preliminary Plat request 3) Modify Preliminary Plat request ATTACHMENTS: 1) Preliminary Plat 2) Schematic Pad Site Layout