Loading...
Robertson Pools-CS 981104/_'~ The City With A Beautiful Future //.~x, Po. BOX 478 COPPELL, TEXAS 75019 FIL PO. Box 478 CoppelI, Texas 75019 972-462-OO22 Ron Robertson Robertson Commercial Pools 569 S. Coppell Road CoppeH, Tx 75019 ~ C~m~-?ools Addi_tion, Lot 1, Block A~ Development Fee Assessment November 4, 1998 Dear Mr. Robertson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $1,514.95 and forward to the Finance Department along with a copy of the Fee Assessment table. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Michael A. Martin, P.E. Assistant City Engineer CC: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE WORKSHEET PROJECT: Robertson Commercial Pools Addition, Lot I, Block A DATE: 11/4/98 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): Total #: 0 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) lrrigatioa/Fireline Water Meter Fee: Total #: 0 Irrigation Meter(s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 0: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. ESU's ESU's ESU's ESU's $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. (100% due prior to issuance of building permit) $0.00 $0.00 Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: Single-family @ $150.00/Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A $1,514.95 N/A Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) N/A Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A Page 2 DEVELOPMENT FEE TABLE Project: Date: Robertson Commercial Pools Addition, Lot 1, Block A 11/4/98 Water Impact Fee (100% due prior to Council Approval) TOTAL FEES DUE $0.00 PRIOR TO COUNCIL APPROVAL $o.oo Water Tap Inspection Fee $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100 % due prior to Council Approval) Roadway Impact Fee $1,514.95 $1,5'14.95 (100 % due prior to Council Approval) Street Light Fee N/A (100% due prior to Acceptance of Project Street Sign Fee N/A (100% due prior to Acceptance of Project Construction Inspection Fee N/A tOTAL II$1,514.95 ~ "~..,., ',.,?...',' ............ TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $1,514.95 ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Robertson Commercial Pools Addition, Lot 1, Block A 11/4/98 ROADWAY IMPACT FEE: Service Area * Category ** Industrial Land Use ** General Light Industrial Building Size (Sq. Ft.) 4,764 Development Units ** 4.764 Vehicle Miles per Development Unit ** 1.06 Fee per Vehicle Mile *** .Roadway Impact Fee due = (Development Units) x !(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $300 $1,514.95 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)