Round Oak-CS 940901COPPELL PUBLIC WORKS DATE: TO: FROM: RE: MEMORANDUM September 1, 1994 Larry Davis, Construction Inspector Howard L. Pafford, Utilities Superintenden Walk-Through for Round Oak Addition Utilities personnel performed a walk through on the above referenced project and the following items were found to be deficient: 1. Lot 28 - clean out straightened and repacked 2. Lot 7 - clean out full of dirt 3. Lot 21 - Clean out dirty 4. Lot 12 - meter can crushed Please ensure that all deficiencies are corrected prior to acceptance of this project. HLP/dm WALKTHRU.HLP/ROUNDRK COPPELL PUBLIC WORKS MEMORANDUM DATE: TO: FROM: RE: September 1, 1994 Larry Davis, Construction Inspecto~ Rey Gonzales, Street Superintendent/ Walk Through - Round Oak Addition Street personnel performed a walk through at the above referenced project. Below is a list of items that are deficient: 1. Westbound approach - Fix chipped concrete in curbs at saw joints and redwood header. 2. Drop inlet//413 westbound 6+" on opening. 3. Drop inlet at 9/8 opening 6+". 4. //28/27 to the west of- fix curb brake at saw joint. If you have any questions, please advise. /rg WALKTHRU.HLP. ROUNDOK. RG