Round Oak-CS 940422Papagolos Development Company 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 214/931-9537 April22,1994 Mr. Alan Johnson Acting Finance Director City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Round Oak Estates Development Fee Assessment Dear Mr. Johnson: Enclosed please find a check in the mount of $37,709.13 payable to the City of Coppell and a copy of the development fee calculations for Round Oak Estates. We look forward to working with the City of Coppell on this project. If You have questions, or require additional information, please contact me. Sincerely, John E. Papagolos cc: Michael A. Martin Enclosures ~'~ MU~'CHISOH DALLAS, TEXAS 75202-2883 B42194 C42194 D42194 E42194 F42194 46 '¢.4, 4 :'1. 0 S WATER iMPACT FEES WAS*':'E WATER iMF'ACT 46r~410G .:::, ~ R,::.I.-.. T S I :]- N F' E !ii; STRiF_ET L.f.~i-tT F'E:.::.' 46';-] 4 1 (,:: ~;i PARK FEE F E E S ]**o'ba 1: 0.00 02530:1, 18,200.00 12,600..00 25S.53 1,755.60 4,980.00' 37,709. 1445 Ross Avenue Suite 5300 · LB 152 Dallas. Texas 75202-2883 A subsidiary of J.D. Murchison Interests, Inc. *****.37~709 Dollars and 13 Cents C ec .o. 025301. COMERICA BANK - TEXAS DALLAS, TEXAS PAY TO THE ORDER OF CITY OF COF'F'ELL F' 0 BOX 478 COF'PELL TX 75019 V?~D AFTER 90 DAYS. Date: Project: CITY OF COPPELL -DEVELOPMENT FEES July 26, 1993 Round Oaks Estates Water Impact Fee (100% due prior to Council Approval) Water Tap Inspection Fee (100%due at Issuance of Building Permit) Wastewater Impact Fee (100% due prior to Council Approval) Sewer Tap Inspection Fee · (100%due at Issuance of Building Permit) Utility Final Inspection Fee (100%due at Issuance of Building Permit) Water Meter Fee (Lots) (100%due at Issuance of Building Permit) Water Meter Depokit (100%due at Issuance of Building Permit) Street Sign Fee (100%due prior to Acceptance of Project) Street Light Fee (100%due prior to Acceptance of Project) Park Fee (50% due prior to Council Approval) (50%due prior to Issuance of Building Permit) TOTAL TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL + Construction Inspection Fee (2 % of Project Cost due prior to preconstruction meeting) TOTAL ASSESSMENT $18,200.00 $ 2,800.00 $ 12,600.00 $ 2,800.00 $ 1,400.00 $ 623.00 $ 840.00 $ 253.53 $1,755.60 $ 9,800.00 $ 51,072.13 AMOUNT DUE PRIOR TO COUNCIL APPROVAL $ 18,200.00 -0- $ 12,600.00 -0- -0- -0- -0- $ 253.53 $ 1,755.60 $ 4,900.00 $ 37,709.13 $ 37,709.13 CRB-111-3 City of Coppell 255 Parkway Boulevard Coppell, Texas 75019 214/462.0022 CRB-111-3 City of Coppell 255 Parkway Boulevard Coppell. Texas 75019 214/462-0022 ~ii~l ' ~:~.l Papagolos Development Company 16Z50 DALLAS PARKWA~ SUITE 100 DALLAS, TEXAS 75248 214/931-9537 April 22, 1994 Mr. Michael A. Martin, E.I.T. City of Coppell P.O. Box 478 Coppell, Texas 75019 RE: Round Oak Estates Construction Inspection Fees Dear Mr. Martin: Enclosed please find a check in the mount of $4,633.05 payable to the City of Coppell for the followhtg ~:onstmction inspection fees: · ' Excavation $80.24 Utilities 2,863.68 Paving 1.689.43' Total $4,633.05 Contracts supporting the above fee calculations are enclosed for your review. We look forward to working with the City of Coppell on this project. If you have questions, or require additional information, please contact me. Sincerely, John E. Papagolos cc: Alan Johnson Enclosures ack K kby & Assoda e$, Excavation Contracting 19101 Wind Mill Lane Dallas, Texas 75252 ¢214) 596-75~2 April 4,1994 Papagolos Development Co. 16250 Dallas Parkway Suite 100 Dallas, Texas 75248 Dear Sirs, The following quote is for the excavation work on the PDuDXS Oak Develo~m~_nt in Coppell Texas. Street Excavation 3,400 cy @' $1.18/cy = $4,012.00 If you have any questions, please feel free to contact me. CULLUM CONSTRUCTION COMPANY, INC. MUNICIPAL CONTRACTORB Post Offlo~ Box 8466 I)elli8, Tex~ 75205 PAPAGOLIS DEVELOPMENT 16250 DALLAS PARKWAY SUITE 100 DALLAS, TEXAS 75248 BID DATE : 4-1-94 WATER, SEWER & DRAINAGE TO SERVE ROUND OAK ESTATES COPPELL TEXAS BID QUANT ITEM UNIT BID' TOTAL BID WATER 1480.00 -LF- 8" PVC WATER DR-14 4.00 -EA- 8" GATE VALVES 2.00 -EA- 6" GATE VALVES 2.00 -EA- FIRE HYDRANT W / LEAD 40.00 -LF- DRY BORE FOR 8" WATER 4.00 -EA- CONNECT TO EXIST MAIN 28.00 -EA- 1" SERVICES 1.00 -TONS- FITTINGS & BLOCKING 1.00 -LS- WATER TEST TOTAL WATER 11.f'0 16,428.00 400.00 .1,600.00 285.00 570.00 1,155.00 2,310.00 131.00 5,240.00 575.00 2,300.00 380.00 10,640.00 3,075.00 3,075.00 815.00 815.00 42,978.00 SEWER 1019.00 -LF- 8" PVC SEWER 11.7d 11;'922..30 1,535.00 4,605.00 3,035.00 3,035.00 340.00 9,520.00 13.50 540.00 87.00 1,305.00 1,200.00 1,200.00 320.00 320.00 375.00 375.00 3.00 -EA- 4' MANHOLE 1.00 'EA- 4'DROP MANHOLE OVER ~. 28.00 -EA- 4" LATERALS W/ CLEANOUT 40.00 -LF' CONCRETE ENCASEHENT 15.00 -SY- REMOVE & REPLACE CONC. PAVING 1.00 -LS- SEWER TEST & T V 1.00 -EA- ADJUST EXIST MANHOLE 1.00 -LS' TRENCH SAFETY TOTAL SEWKR 32,822.30 DRAINAGE ~-LF- 36" CL. III RCP 310.00 -LF- 36" CL. IV RCP 108.00 -LF- 30" CL. III RCP 127.00 -LF- 30" CL. IV RCP 106.00 -LF- 27" CL. III RCP 136.00 -LF- 27" CL. IV RCP 12.00 -LF- 24" CL. III RCP 115.00 -LF- 18" CL. III RCP 91.00 -LF- 18" CL. IV RCP 10.00 -EA- RCP WIRES 1.00 -EA- CONNECT TO EXISTING RCP 1.00 -LS- REMOVE H.W. & 36" RCP 1.00 -EA- DOUBLE 10' INLET 6.00 -EA- 10' INLET 1.00 -EA- 3' X 3' "Y" INLET 3.00 'EA- RCP PLUGS 1.00 -LS' TRENCH SAFETY 47.40' 10,001.40 52.50 16,275.00 36.00 3,888.00' 40.30 5,118.10 32.60 3,455.60 37.30 5,072.80 30.00 360.00 23.50 2,702.50 24.40 2,220.40 210.00 2,100.00 500.00 500.00 270.00 270.00 3,500.00 3,500.00 1,800.00 10,800.00 900.00 900.00. 35.00 105.00 100.00 100.00 TOTAL ST6RM SEWER 67,368.80 TOTAL WATER, SANITARY SEWER, & STORM SEWER TOTAL MATERIALS $ 86~508.95 TOTAL LABOR $ 56,660.15 NOTES: WE CAN COMPLETE THIS PROJECT IN 16 WORKING DAYS. IF A PERFORPIA/qCE & PAYMENT BOND IS REQUIRED ADD $ 3,500. 143,169.10 Austin Bridge & Road An Au,..~in Industries Company PROPOSAL TO: PAPAGOLOS DEVELOPMENT COMPANY 16250 Dallas Parkway, Suite 100 Dallas, Texas 75248 Austin BdCge & Roa(~ inc. 11143 G~igh~ ~ne Dales, Te~ 7~ 2~ 4 484-88~ 214 ~8-7173 (Me~o) 214 406-8256 ~cceun~g 2144C6-a243 (~i~ April 22, 1994 Gentlemen: We propose to furnish all labor, materials and equipment to construct, as an independent contractor, the following described work:- DESCRIPTION AND LOCATION: ITEM DESCRIPTION: 6" 3000# Reinf Conc St Pvmt 6" Lime Subgrade Prepara'bion Hydra, ed Lime (27#/SY) Saw a Rem Existing Curb Construct New Curb & Gutter Performance & Payment Bonds Handicap Ramps 4" Conc Sidewalk (4' wide) Remove asph/conc Pavement 6" Integral Curb on Flume ~onc Flume Steel Plate on Flume (3/Sx2?x48) Cone Mow Strip APPROX UNIT QTY. UNIT PRICE 3,500 SY $18.89 3,750 S¥ $1.40 51 TON $78.00 128 LF $6,00 60 LF $12.00 1 LS $1,200,00 2 EA $500.00 940 SF $2.25 80 SY $14.00 20 LF $1.00 200 SF $3.00 1 EA $600.00 438 SF $2.25 Total .... AMOUNT $66,115.00 $5,250.00 $3,978.00 $768.00 $720.00 SI,200.00 $1,000.00 $2,115.00 $1,120.00 $20.00 $600.O0 $600.00 $985.60 $84,471.50 See Attached Bid Quali£icat.ions. APR E~ '94 1~3;,-"~ HUb i iM_PRVIHG_ESTIMATIMG B I D QUA L I F I. CAT IONS PROJECT: ROUND OAK ESTATES, COPPELL BID DATE: April 22, 1994 Bid prices include one year, 10% Maintenance Bond; Silicone Joint Seal: and reinforcing with #3's ~ 24" centers. If requested, paving of turnaround at end of Xaye Street will be constructed for $22.00 per Sq Yd and $1.00 per Lin Ft of integral curb. Owner will pay as extra .for engineering & layout, testing, permits and inspection fees required by City, County, or Owner. All work to be performed under Highway-Heavy wage rates. These prices based on 1 move-in for stabilization & i move-in for concrete pavement. If additional move-ins are required there will be an additional charge of $3,000.00 for stabilization and $5,000.00 for concrete paving. Utility contractor is to clean .up his excess excavation prior to our moving on the job and get compaction in all utility ditches. Manholes, cleanouts, and water valve adjustments are not included in bid. If required the unit prices will be $2S0.00 for each manhole adjustment, $250.00 for each cleanout adjustment, and $210.00 for each water valve adjustment. This bid does not include any temporary or permanent erosion control devices much as hay bales, silt fence, or seeding. This bid does not include any pavement markings, wheelchair ramps, sidewalk, brick pavers, conduit crossings, or light .pole foundations unless called out in the proposal as a bid item. Items will be measured to determine quantities for final payment. Retainage will be paid in full upon measuring of final quantities, and acceptance of our work by the City of Coppell. Austin Bridge & Road, Inc.'s indemnification shall be to the extent of our own negligence. Austin Bridge & Road, Inc. shall have no liability for design. Any contract other than this proposal shall be subject to approval by Austin Bridge & Road, Inc. . P.3 Partial payments shall be made on the tenth day of each month for all work completed durinE the preceding month. Upon completion of the work, final payment, including retainage, shall be made in cash immediately upon receipt of our invoice, with interest at eighteen percent (18%) per annum charged on any amount remaining unpaid thirty days thereafter, together with reasonable attorney's fees and cost of collection, if incurred. We assume no responsibility for delays to the work as a result of adverse weather, strikes, accidents, or other factors beyond our control, and. this contract may not be voided for causes beyond our control with- out our written consent. Your acceptance of this proposal by signing and returning original copy to us within ten days and the_approval by'us of credit arrangementm, wi!t'constitute a contract. ACCEPTED: BANK REF: AUSTIN BRIDGE & ROAD, INC. Senior Estimator 11143 Goodnight Lane Dallas, Texas 75229 (214) 484-8863 OTHER REF: