Sand Point-CS 920707 SAND POINT ADDITION PUNCHLIST (JULY 7, 1992) Please complete the following items: 1. Place valve nut extension at top valve tie-in to the 16" water main. 2. Color code F.H. 3. Sweep paving section. 4. Seal curb joints 5. Maintain barricades until signage to be placed. If you have any questions, please call me at 393-1016 extension 224. ~haranrykS~~ - Construction Inspector CLD/bd SANDPUNC COPPELT. PUBLIC WORKS MEMORANDUM DATE: July 7, 1992 TO: Larry Davis, Construction Inspector FROM: Howard Pafford, Utilities & Water Superintendent.~.~/~ Walk-thru Sand Point Estates This morning utilities field staff performed a walk-thru in the above referenced subdivision. The only item found to be deficient was the valve stack for the water line tie-in to the 16" main on Sandy Lake needed a valve nut extension. Please insure that this item is addressed prior to final acceptance of this project. If you have any questions regarding this matter, please advise. HLP/dg SAND. HLP COPPELL P~BLIC WORKS MEMORANDUM DATE: July 7, 1992 TO: Larry Davis, Construction Inspector FROM: Rey Gonzales, Streets Superintenden~ RE: Sand Point Subdivision Street division staff performed a preliminary walk-thru at the above referenced project at 10:00 a.m. on 7/7/92. The following deficiencies were noted; · Street needs to be swept. · Seal curb joints. · Clean out inlets. · Barricades need to be maintained until proper signage is in place. · Stop access off of Sandy Lake Road by placing a temporary berm. · Monitor and maintain erosion control along entire project. Please make sure the contractor receives a copy of this punch list and let me know when it will be ready for a follow up. RG/dg SAND2. RG