Loading...
Sand Point-CS 920305 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 PRE-CONSTRUCTION PACKET PROJECT NAME: ,~¢~.Va~ T'~O, L ATTENDANCE SHEET NAME: COMPANY: PHONE: (~) - CITY OF COPPELL PRE-CONSTRUCTION CONFERENCE PROJECT NAME: -.~c~' "~'~'~-~ DATE: TIME: ASSIGNED INSPECTOR: I. ATTENDANCE: ( See Attached List ) II. PLANS FURNISHED TO: A) CITY YES NO B) CONTRACTOR YES NO C ) OWNER YES NO III. UTILITY COMPANIES NOTIFIED: A) TELEPHONE -~ B) SAS c/lq c C) ELECTRIC /~ D) CABLE T.V. ~,~ E ) OTHER IV. STATUS OF RIGHT-OF-WAY AND/OR LAND DOCUMENTS: EASEMENTS YES NO HIG~AY PERMIT YES NO RAILROAD PERMIT YES __ NO STREET CUT PERMIT YES __ NO BORING PERMIT YES __ NO V. INSPECTION: A. DAILY INSPECTION BY ASSIGNED INSPECTOR B. AFTER HOURS AND WEEKENDS (OVERTIME) TO BE PAID BY THE CONTRACTOR "AT OVERTIME C. CONTRACTOR AND SUB-CONTRACTORS TO NOTIFY INSPECTOR AT LEAST ~WENTY-FOUR (24) HOURS BEFORE WATER/SANITARY SSI4ER/STORM SEWER/ PAVING CONSTRUCTION BEGINS. (2) VI. TESTING OF MATERIALS: 1. DENSITIES 2. APPROVED CONCRETE BATCH DESIGN 3. CONCRETE PAVING INCLUDING CORES 4. APPROVED ASPHALT BATCH DESIGN SEND ONE COPY OF THE TEST REPORTS TO THE INSPECTOR VII. STREET CLOSING REQUIRED: YES __ NO IF YES, CONTRACTOR TO NOTIFY THE CITY, POLICE AND FIRE DEPARTMENT SEVENTY-TWO (72) HOURS IN ADVANCE. VIII. CONSTRUCTION BARRICADES AND TRAFFIC CONTROL: C. WPd~NING BIGI-I'I~ YES NO IF STREET DEPJ~RTMENT H~ TO COVlE OUT TO MOVE THE Bg~RICADES AND/OR REPLACE g2qY Bg/~,RICADES, THE CONWR~CTOR ~ILL BE CttARGED FOR THEIR TIME. IX. AS-BUILT PLANS: CONTRACTOR AND/OR ENGINEER WILL BE RESPONSIBLE FOR SUBM_I2'~ING THE CORRECT "AS-BUILT" PI.hNS TO TIIE CITY. X. INFORI~TION: DEVELOPER: N31VlE: ADDRESS: PHONE: PROJECT I~hlqAGER: CONSULTING ENGINEER-- ADDRESS: PHONE: PROdECT ENGINEER: (3)