Sand Point-CS 920214 ' ,,._/ /{. ua ,.-".L ~--",.". _Z~,'.,'-_7.~__~_./-:. /~/
~.~' --..~/~-:-' ...~ ,'-:: ~' ,'-":--._:--.=//~/-~7:_-7_/ ! I ' Z "~- i-~/ CoppeH.P'O' Box 478
Texas
75019
~,..---// ,/',2--~ ~! The City W,th A Beautiful Future
~ "---d ~,---~" ) 214-462-0022
/
ruary~''~ 14, ,.' 992
Mr. To~my Canslor
CCH Engineering Corp.
i120 Emprie Central Place, Suite 308
Dallas, TX 75247
Re: Sandpoint Estates
Dear Mr. Canslor:
I have received and reviewed the revised plans submitted for Sandpoint
Estates and have the following comments to offer:
i) The 8" waterline that crosses sanitary sewer Line B at
approximately Station 0+30 should be concrete encased as shown
on Sheet 3 of the plans.
2) The location of the sidewalk should be shown on both Sandpoint
Court and Park Valley Drive and also shown in the typical
paving section.
3 Ihe 8" sanitary sewer line that crosses storm drain Line A at
approximately Station 2+60 should be concrete encased as shown
on Sheet 5.
Ail standard details should be included in the plans.
5) Your sheet index on the coversheet indicates that your
landscaping irrigation plans are shown on Sheet 6. However,
those plans were submitted separately. If they are to be
incorporated in this set of plans, they should be included when
the plans are resubmitted. If they are not to be incorporated
in this set of plans, then the sheet index should be revised
accordingly.
6) Building Inspections had the following comments about the
screening wall:
a) Need legible signature on the seal.
b) Need "Hold Harmless" letter.
Once the plans have been revised, please resubmit this mark-up set with
the revised plans.
if you should have any questions or need any additional information,
please feel free to contact me at your convenience.
Sincerely,
Kenneth X. Griffin, P.E.
City Engineer