Sand Point-CS 920127January 27, 1992 /..~ Mr. Tomy Canslor CCM EnGineering Corp. 630 N. Hi§hway 67 Cedar Hill, Texas 75104 Re: S~d Point Estates Development Fee Assessment Dear Mr. Canslor: Enclosed is a revised copy of the City of Coppell Development Fee Assessment list for Sand Point Estates. Please disregard the previous list [dated January 23, 1992). The Wastewater Impact Fee was inadvertently omitted from that list. Please provide a check made payable to the City of Coppell in the Mount of $25,868.95 plus 2% of the construction cost~ and forward it to Alan Johnson, Finance Department, along with a copy of the Fee Assessment list. In addition, please provide me with a copy of the Engineer's Estimate for this project or the contract Mount for verification of the construction inspection fee. If you should have any questions, please do no hesitate to contact me. Sincerely, eth~. ~ Griffin, P.E. City Engineer ~G/bd cc: Steve Gor~, Director of Public Works Alan Jonson, Assistant Finance Director Frank Trando, Finance Director M. Shohre Danes~and, P.E., Civil Engineer SAND3 CITY OF COPPELL DEVELOPMENT FEES Date: January 27, 1992 Project: Sand Point Estates Amount Due Prior to Council Total Fees Approval Park Fee Assessment $ 4,050.00 (27 lots X $150 Per Lot) (50% due at final plat approval) $ 2,025.00 (50% due prior to bldg. permits issuance Water Impact Fee $ 17,550.00 $ 17,550.00 (100% due prior to Council approval of final platl Water Tap Inspection Fee $ 2,700.00 - (100% due prior to issuance of building permit) Wastewater Impact Fee $ 6,075.00 $ 6,075.00 (100% due prior to Council approval of final plat) Sewer Tap Inspection Fee $ 2,700.00 - (100% due prior to issuance of building permit) Street Sign Assessment $ 218.95 $ 218.95 (see attached) Street Light Assessment * - ($292.60 X .... poles) (see attached) Construction Inspection Fee $ $ (2% of construction cost) TOTAL AMOUNT DUE: $ 33,293.95 $ 25,868.95 TOTAL ~MOUNT DUE PRIOR TO COUNCIL APPROVAL $ 25,868.95 Plus 2% Construction Inspection Fee · THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED $292.60 PER LIGHT WILL BE ASSESSED. SAND2 COPPELL PUBLIC WORKS By: Engineering ~40RANDU~ TO: Shohre Dane~FEmand, Acting City Engineer ,.~-'~ FROM: Public Works Staff RE: Development Fees for Sand Point Estates The following fees should be assessed on the above referenced project. Water Impact Fee: (Does not include Irrigation) 27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's - Irrigation Meter/s = ESU's -Fireline Meter/s = ESU's Total 27 ESU's 6 $650.00 ea = $17,550.00 100% due prior to Council approval of final plat. Wastewater Impact Fee: (MUD) 27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's ~ $225.00 = $6.075.00 100% due prior to Council approval of final plat. Water Tap Inspection Fee 27 Connections ~ $100.00 each = $2,700.00 100% due prior to issuance of building permit. Sewer Tap Inspection Fee 27 Connections @ $100.00 each = $2,700.00 100% due prior to issuance of building permit. Street Lighting Fee Shall be assessed and paid prior to final acceptance of project. Note: This fee cannot be assessed until after TU Electric submits the lighting plan for the proposed project. Once plan is submitted $292.60 per light will be assessed. Street Signs Fee See attached Street sign assessment sheet. 100% due prior to final acceptance of project. Park Fee 27 Residential Lots at $150.00 each = $4,050.00 Units (Multi family) at $75.00 each = $ 50% of the amount specified above shall be paid by the Developer; prior to Council approval of final plat. 50% remaining shall be paid by the Builder at such time as a building permit is issued. Please advise the Developer of these fees and due dates. If you have any questions regarding these assessments please advise. HLP/mp cc: Steven G. Goram, Director of Public Works DEVELFEE.HLP STREET SIGN ASSESSMENT for Sand Point Estates The following assessment is being made in accordance with the City of Coppell Subdivision Ordinance Appendix A chapter VIII A. The following cost of those sign materials required are based on current pricing which is reviewed on a regular basis. SIGN UNIT PRICE QUANTITY EXTENDED PRICE No Parking $ 53.10 Speed Limit $ 63.54 1 $ 63.54 Yield $ 58.56 Stop $ 65.12 Street Name $ 11.60 Stop & Street Combo $ 96.85 I $ 96.85 OTHER No Outlet $ 58.56 I $ 58.56 TOTAL $ 218.95 * Cost breakdowns may be obtained from Public Works by written request. Revised 4/1/91