Sand Point-CS 920127January 27, 1992 /..~
Mr. Tomy Canslor
CCM EnGineering Corp.
630 N. Hi§hway 67
Cedar Hill, Texas 75104
Re: S~d Point Estates
Development Fee Assessment
Dear Mr. Canslor:
Enclosed is a revised copy of the City of Coppell Development Fee
Assessment list for Sand Point Estates. Please disregard the previous
list [dated January 23, 1992). The Wastewater Impact Fee was
inadvertently omitted from that list.
Please provide a check made payable to the City of Coppell in the Mount
of $25,868.95 plus 2% of the construction cost~ and forward it to Alan
Johnson, Finance Department, along with a copy of the Fee Assessment
list. In addition, please provide me with a copy of the Engineer's
Estimate for this project or the contract Mount for verification of the
construction inspection fee.
If you should have any questions, please do no hesitate to contact me.
Sincerely,
eth~. ~ Griffin, P.E.
City Engineer
~G/bd
cc: Steve Gor~, Director of Public Works
Alan Jonson, Assistant Finance Director
Frank Trando, Finance Director
M. Shohre Danes~and, P.E., Civil Engineer
SAND3
CITY OF COPPELL
DEVELOPMENT FEES
Date: January 27, 1992
Project: Sand Point Estates
Amount Due
Prior to
Council
Total Fees Approval
Park Fee Assessment $ 4,050.00
(27 lots X $150 Per Lot)
(50% due at final plat approval) $ 2,025.00
(50% due prior to bldg. permits
issuance
Water Impact Fee $ 17,550.00 $ 17,550.00
(100% due prior to Council approval
of final platl
Water Tap Inspection Fee $ 2,700.00 -
(100% due prior to issuance of
building permit)
Wastewater Impact Fee $ 6,075.00 $ 6,075.00
(100% due prior to Council approval
of final plat)
Sewer Tap Inspection Fee $ 2,700.00 -
(100% due prior to issuance of
building permit)
Street Sign Assessment $ 218.95 $ 218.95
(see attached)
Street Light Assessment * -
($292.60 X .... poles)
(see attached)
Construction Inspection Fee $ $
(2% of construction cost)
TOTAL AMOUNT DUE: $ 33,293.95 $ 25,868.95
TOTAL ~MOUNT DUE PRIOR TO
COUNCIL APPROVAL $ 25,868.95
Plus 2% Construction
Inspection Fee
· THIS FEE CANNOT BE ASSESSED UNTIL AFTER TU ELECTRIC SUBMITS THE
LIGHTING PLAN FOR THE PROPOSED PROJECT. ONCE PLAN IS SUBMITTED
$292.60 PER LIGHT WILL BE ASSESSED.
SAND2
COPPELL PUBLIC WORKS By: Engineering
~40RANDU~
TO: Shohre Dane~FEmand, Acting City Engineer ,.~-'~
FROM: Public Works Staff
RE: Development Fees for Sand Point Estates
The following fees should be assessed on the above referenced
project.
Water Impact Fee: (Does not include Irrigation)
27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's
- Irrigation Meter/s = ESU's
-Fireline Meter/s = ESU's
Total 27 ESU's 6 $650.00 ea = $17,550.00
100% due prior to Council approval of final plat.
Wastewater Impact Fee: (MUD)
27 - 5/8" x 3/4" Domestic Meter/s = 27 ESU's ~ $225.00 = $6.075.00
100% due prior to Council approval of final plat.
Water Tap Inspection Fee
27 Connections ~ $100.00 each = $2,700.00
100% due prior to issuance of building permit.
Sewer Tap Inspection Fee
27 Connections @ $100.00 each = $2,700.00
100% due prior to issuance of building permit.
Street Lighting Fee
Shall be assessed and paid prior to final acceptance of project.
Note: This fee cannot be assessed until after TU Electric submits
the lighting plan for the proposed project. Once plan is
submitted $292.60 per light will be assessed.
Street Signs Fee
See attached Street sign assessment sheet.
100% due prior to final acceptance of project.
Park Fee
27 Residential Lots at $150.00 each = $4,050.00
Units (Multi family) at $75.00 each = $
50% of the amount specified above shall be paid by the Developer;
prior to Council approval of final plat.
50% remaining shall be paid by the Builder at such time as a
building permit is issued.
Please advise the Developer of these fees and due dates.
If you have any questions regarding these assessments please
advise.
HLP/mp
cc: Steven G. Goram, Director of Public Works
DEVELFEE.HLP
STREET SIGN ASSESSMENT
for Sand Point Estates
The following assessment is being made in accordance with the City
of Coppell Subdivision Ordinance Appendix A chapter VIII A. The
following cost of those sign materials required are based on
current pricing which is reviewed on a regular basis.
SIGN UNIT PRICE QUANTITY EXTENDED PRICE
No Parking $ 53.10
Speed Limit $ 63.54 1 $ 63.54
Yield $ 58.56
Stop $ 65.12
Street Name $ 11.60
Stop & Street Combo $ 96.85 I $ 96.85
OTHER
No Outlet $ 58.56 I $ 58.56
TOTAL $ 218.95
* Cost breakdowns may be obtained from Public Works by written
request.
Revised 4/1/91