Loading...
Sandy L Add L2BA-CS 960930 __ ~ P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 September 30, 1996 Daniel R. Wewer Irving, Tx 75016-8166 RE: Sandy Lake Addition, Lot 2, Block A (Children First Academy) Development Fee Assessment Dear Mr Wewer: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $5,625.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincer,ely, . f - A~istant City Manager/City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services DEVELOPMENT FEE TABLE Project: Sandy Lake Addition, Lot 2, Block A (Children First Academy) Date: 9/30/96 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,375.00 $3,375.00 (100% due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $134.93 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $48.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $2,250.00 $2,250.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $6,073.23 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $5,625.00 DEVELOPMENT FEE WORKSHEET PROJECT: Sandy Lake Addition, Lot 2, Block A (Children First Academy) DATE: 9/30/96 Water Impact Fee: Domestic Meter(s): 1 - 1 1/2 inch -- 5 ESU's Irrigation Meter(s): 1 - 1 inch = 2.5 ESU's = ESU's Fireline Meter(s): 0 -N/A -- ESU's Total 8: 7.5 ESU's @ 9450.00 ea. 93,375.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total 8: 2 Connections @ 950.00 ea. $100.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total 8: I Domestic Meter(s) @ 9134.93 9134.93 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation/Fireline): Total 8: 1 Irrigation Meter(s) @ 948.30 948.30 Total 8: 0 Additional Irrigation Meter(s) @ 90.00 Total 8: 0 Fireline Meter(s) @ 90.00 (100% due prior to issuance of water meters) Water Meter Deposit Fee (Domestic): Total 8: I Meter(s) @ 930.00 ea. 930.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total 8: 1 Meter(s) @ 93§.00 ea. 935.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 5 @ 9450.00 ea. 92,250.00 Wastewater Tap Inspection Fee: Total 8: 1 Connections @ 950.00 ea. 950.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total 8: 1 Lots @ 950.00 ea. 950.00 (100% due prior to issuance of building permit) Page 1 DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A NIA Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $0.00 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U, Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at this time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Sandy La~ Addition, Lot 2, Block A (Children First Academy) DATE: 9/30/96 ROADWAY IMPACT FEE: Service Area * 2 Category ** Institutional Land Use ** Day Care Center Building Size (Sq. Ft.) N/A Development Units ** 194 Vehicle Miles per Development Unit ** 0.37 Fee per Vehicle Mile *** $300 [Roadway Impact Fee due -- (Development Units) x [ (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile_)._-- _ $21,534.00 · (Figure 2 - Roadway Impact Fee Study) · * (Table 3 - Roadway Impact Fee Study) · ** (Schedule 2, Page 3 - Roadway Impact Fee Study) Roadway Impact Fee is waived due to Univest Agreemem