Loading...
Sandy L Add L2BA-CS 960916 P.O. Box 478 Coppell, Texas 75019 The City With A Beautiful Future 214-462-0022 September 16, 1996 Guillermo Juaraz Dowdey Anderson & Assoc., Inc. 16250 Dallas Pkwy, Ste. 100 Dallas, TX ?5248 RE: Sandy Lake Addition Lot 2, Block A (Children First Academy) Dear Mr. Juaraz: The City of Coppell has received and reviewed the referenced plans and has the following comments to offer: 1. A letter must be provided for variance for waiving the required 6" lime stabilized subgrade. 2. If food is prepared in the building, a grease trap or interceptor/water access device is needed. 3. Indicate on the Paving and Grading Plans the location and distance of sawed dummy joints. Also, all joints should be silicone sealed. 4. All fire hydrant locations shall be approved by the Fire Department. 5. A hold harmless letter needs to be provided for the proposed fence across the proposed utility easement for the 8" sanitary sewer line. Also, access to all manholes should be allowed at all times and should not be blocked by obstructions. 6. The proposed water line extension off of the private water line shall be located outside of the public utility easement. 7. Provide a valve on the proposed water line extension located at the south side of the development. 8. The location of the 5'x5' utility easement is shown to be in a 10' TU Electric easement. If the TU Electric easement is existing, permission must be obtained from TU Electric to be in their easement. Please verify this. 9. On the drainage area map, the proposed sanitary sewer manhole appears to be in the middle on the proposed swale. Please indicate on the Drainage Plan the exact locations of the proposed manhole. If this falls in the swale, then the manhole needs to either be a locked down manhole or raised so that water does not enter the manhole. 10. On the Storm Water Pollution Prevention Plan, provide an erosion protection siltation fence around existing Y-inlet. There are various other minor comments throughout the plans. Once these comments have been addressed, the marked up plans along with two revised sets of plans should be resubmitted to the City for review. If you should have any questions concerning these comments, please contact me at 304-3681. Sincerely Michael A. Martin, E.I.T. Assistant City Engineer