Loading...
SC-CFBISD Riverchase-LR000504FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: May 4, 2000 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO.' 0791-2184 SAMPLE DATE: March 8, 2000 CONTRACTOR: TICKET NO.: 474504 AMBIENT TEMP. (°F): 82 CONCRETE TEMP. (°F) (ASTM C-10~4): 72 TIME BATCHED: 8:35 TIME SAMPLED: 10:35 WEATHER CONDITION: Overcast LOCATION OF PLACEMENT: Striland Construction CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (Aswa c.231): WATER ADDED (gal): SLUMP (in.) (ASWa C-143): Lattimore 27/823 9351 0 61/4 Sidewalk around Area C and D, sampled at line 15 by lines M to N (entrance way) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 259 7 03/15/00 82000 2900 4000/28 .days REC 260 28 04/05/00 105000 3710' REC 261 28 04/05/00 107000 3790* REC 262 56 05/03/00 109000 3860* Fracture mode is (A) unless ol~erwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ ~] ~ C Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: * Does not meet required compressive strength at 56 days. Technician: Mike Flute SMH/mv Distribution: FUGRO SOUTH INC. Reviewed By:t~~~-''~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Pays.ne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell