Loading...
SC-CFBISD Riverchase-LR000406FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, cJo DaI-Mac Const. REPORT DATE: April 6, 2000 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: March 8, 2000 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-10~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Striland Construction 474504 CONCRETE SUPPLIER: Lattimore 82 PLANT/TRUCK: 27/823 72 MIX ID NUMBER: 9351 8:35 AIR (%) (ASTM C-231): 10:35 WATER ADDED (gal): 0 Overcast SLUMP (in.) (ASWa C-143): 6 1/4 Sidewalk around Area C and D, sampled at line 15 by lines M to N (entrance way) CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 259 7 03/15/00 82000 2900 4000/28 days REC 260 28 04/05/00 105000 3710' REC 261 28 04/05/00 107000 3790* REC 262 56 05/03/00 Fracture mode is (A) unless otherWise noted Specifications: Making & ASTM C-31 Testing ASTM 0-143, Typesof k-~l r'~ r-'~ r--~ Curing: Methods: ASTM C-39 Fmc_h_,re: A[/v~] ~ ~uB C D REMARKS: * Does not meet required compressive strength at 28 days. Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis ~ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell