SC-CFBISD Riverchase-LR000321FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, cio DaI-Mac ConstructionREPORT DATE: March 21,2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: March 20, 2000 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Slab - Stage floor for auditorium following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 12:20 pm 1:20 4-3/4 to 5.0 3.0 - 5.0 Pioneer - Plant No. 27 62 - 63°F 3000/28 4 No Bob Shea Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis ~'~ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell