SC-CFBISD Riverchase-LR000321FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Carrollton-Farmers Branch lSD, cio DaI-Mac ConstructionREPORT DATE: March 21,2000
Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184
DATE PERFORMED: March 20, 2000
General Contractor: DaI-Mac
Method of Test:
Applicable ACl Recommendations and ASTM Standards
Results / Remarks:
Concrete placement observation was performed at the Slab - Stage floor for auditorium
following location:
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
12:20 pm
1:20
4-3/4 to 5.0
3.0 - 5.0
Pioneer - Plant No. 27
62 - 63°F
3000/28
4
No
Bob Shea
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis ~'~
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell