Loading...
SC-CFBISD Riverchase-LR000301FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: SPRAYED ON FIREPROOFING REPORT Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: March 1, 2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 Page 1 DAILY ACTIVITY REPORT: February 15, 2000 Services Performed: Visual Inspection and Thickness / Density Testing, ASTM E-605 Weather Conditions: Sunny Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced project. Locations apd results are listed below. Sample i Type of Steel Location MeasUredAVe~age DensiW Number Member : (lbS!ca: fti)= C-7 Joist Area "A" 1-1/2 15.0 C-7 Beam Area "A" 3/4 15.0 C-7 Deck Area "A" 1 15.0 L-8 Joist Area "A" 2 14.1 L-8 Beam Area "A" 7/8 14.1 L-8 Deck Area "A" 1 14.1 W-10 Joist Area "B" 1-3/4 15.7 W-10 Beam Area "B" 5/8 15.7 W-10 Deck Area "B" 1-1/8 15.7 B-14 Joist Area "C" 2 14.8 B-14 Beam Area "C" 1 14.8 B- 14 Deck Area "C" 1 14.8 M- 13 Joist Area "C" 1-3/4 14.0 M-13 Beam Area "C" 3/4 14.0 M- 13 Deck Area "C" 1 - 1/4 14.0 W-15 Joist Area "C' 1-1/2 14.3 W-15 Beam Area "C" 7/8 14.3 W-15 Deck Area "C' 1-1/8 14.3 AA5-19 Joist Area "D" 1-3/8 15.5 AA5-19 Beam Area "D" 1 15.5 AA5-19 Deck Area "D" 1 15.5 AF-16 Joist Area "D" 1-1/2 14,3 AF-16 Beam Area "D" 1 14.3 AF-16 Deck Area "D' 1 14,3 FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 SPRAYED ON FIREPROOFING REPORT Carrollton-Farmers Branch lSD, c/o DaI-Mac Construction REPORT DATE: March 1, 2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 Page 2 DAILY ACTIVITY REPORT: February 15, 2000 Services Performed: Visual Inspection and Thickness / Density Testing, ASTM E-605 Weather Conditions: Sunny Contractors on Site: DaI-Mac Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced project. Locations and results are listed below. Sample Type of Steel Number Member M-12 U-10 AC-10 Location Column Area "C" Column Area "B" Column Area "D' MINIMUM REQUIREMENT MeaSUred Average I Density Thickness ~I (IbSlcu'ft') 1-1/2 [ 14.1 1-1/4 15.0 1-1/2 14.6 No deficiencies were observed in the areas which had sprayed on fireproofing material applied. Test results comply with project specifications unless otherwise indicated. Mike Flute Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell