SC-CFBISD Riverchase-LR000301FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
SPRAYED ON FIREPROOFING REPORT
Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: March 1, 2000
Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184
Page 1
DAILY ACTIVITY REPORT: February 15, 2000
Services Performed: Visual Inspection and Thickness / Density Testing, ASTM E-605
Weather Conditions: Sunny
Contractors on Site: DaI-Mac
Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced
project. Locations apd results are listed below.
Sample i Type of Steel Location MeasUredAVe~age DensiW
Number Member : (lbS!ca: fti)=
C-7 Joist Area "A" 1-1/2 15.0
C-7 Beam Area "A" 3/4 15.0
C-7 Deck Area "A" 1 15.0
L-8 Joist Area "A" 2 14.1
L-8 Beam Area "A" 7/8 14.1
L-8 Deck Area "A" 1 14.1
W-10 Joist Area "B" 1-3/4 15.7
W-10 Beam Area "B" 5/8 15.7
W-10 Deck Area "B" 1-1/8 15.7
B-14 Joist Area "C" 2 14.8
B-14 Beam Area "C" 1 14.8
B- 14 Deck Area "C" 1 14.8
M- 13 Joist Area "C" 1-3/4 14.0
M-13 Beam Area "C" 3/4 14.0
M- 13 Deck Area "C" 1 - 1/4 14.0
W-15 Joist Area "C' 1-1/2 14.3
W-15 Beam Area "C" 7/8 14.3
W-15 Deck Area "C' 1-1/8 14.3
AA5-19 Joist Area "D" 1-3/8 15.5
AA5-19 Beam Area "D" 1 15.5
AA5-19 Deck Area "D" 1 15.5
AF-16 Joist Area "D" 1-1/2 14,3
AF-16 Beam Area "D" 1 14.3
AF-16 Deck Area "D' 1 14,3
FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
SPRAYED ON FIREPROOFING REPORT
Carrollton-Farmers Branch lSD, c/o DaI-Mac Construction REPORT DATE: March 1, 2000
Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184
Page 2
DAILY ACTIVITY REPORT: February 15, 2000
Services Performed: Visual Inspection and Thickness / Density Testing, ASTM E-605
Weather Conditions: Sunny
Contractors on Site: DaI-Mac
Remarks: Sprayed on Fireproofing Thickness / Density Testing was performed at the above referenced
project. Locations and results are listed below.
Sample Type of Steel
Number Member
M-12
U-10
AC-10
Location
Column Area "C"
Column Area "B"
Column Area "D'
MINIMUM REQUIREMENT
MeaSUred Average I Density
Thickness ~I (IbSlcu'ft')
1-1/2 [ 14.1
1-1/4 15.0
1-1/2 14.6
No deficiencies were observed in the areas which had sprayed on fireproofing material applied. Test results
comply with project specifications unless otherwise indicated.
Mike Flute
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By:
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell