Loading...
SC-CFBISD Riverchase-LR000215FUGRO SOUTH, INC. .~ll01~o iiVi CLIENT: PROJECT: REPORT NO: Owner: Architect: Engineer: Contractor: Fabricator: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT Carrollton - Farmers Branch lSD c/o DaI-Mac Construction Riverchase Elementary School, Coppell, Texas 13 Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction DATE: February 15, 2000 PROJECT NO: 0791-2184 PAGE 1 Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on ~Str I Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field ReDorts for S~eciflc Items Insnected or Tested and Tvoe of Inspection or Tesflna ~erformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Projec{ Incomplete Fabrication Is: Erection Is: X In Compliance X Non Compliance Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Jason Lillard Dal-Mac Construction - Nate Pe/yne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Doug Post STR-1 FUGRO SOUTH, INC. CLIENT: PROJECT: REPORT NO: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620.7328 NON - COMPLIANCE REPORT Carrollton - Farmers Branch lSD cJo DaI-Mac Construction Riverchase Elementary School, Coppell, Texas 13 DATE: February 15, 2000 PROJECT NO: 0791-2184 PAGE 2 Number Description Location Deviate From Corrective Action Taken 1 Item deleted. In compliance 2 Item deleted. In compliance 3 Anchor bolts too short in Foundation Drawings Corrections have been made per length to receive a full nut Area C grid RFI 80. In compliance 1t4/00 G@14, J@15 NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certtfled Welding Inspector, ASNT/Certified Level 2 (UT, MT) STR-1 FUGRO SOUTH, INC. RI] ~ Virgo Lane: Oalla~. Texas (972) 484-8301; Fax (972) 69.0-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: DATE: ~- -I,.~- ~ PROJECT: ~ PROJECT NO~ REPORT NO: PAGE., F Type of inepectten Location C~.eck Bolt Tightening ProceOum C.~.ck Connecaon fo. R.uimcl Size of Bo,ts C~eck Conne~on for R.uired NO. of Be'ts Check Bolt T'~ghmess wi. Torque Wrench Visual Inspection of Tension Control Bolts Bearing Bolted Connections I Snug Tight Check ao~<~ Con.ec~on / Tur~ of Nut C,-=~ Si=e, L.g.~...d No. of S,e.r c:eck Size La. ConnK. on on com~osi~ Deck J C:e~ Siz:e La; on P, oaf Deck C.~eck Installation of 8ridging on Joists I Girclers C.~,ck InsCallalion of Exgansion Anct~ors Rer. ort hand written at time of insi~ec~on ~y Fielct lns~ec=or Re~o~ will 13e sut~mitted as is and ~ot fy;ed V' in ~ox = in compliance X in I=ox = Non compliance } See Non com;liance report Inspected By: Doug PosL AWSICer~fied WetCin§ Ins;ec:or. ASNT/Cer'.ifieC Level 2 (UT, MT)