Loading...
SC-CFBISD Riverchase-LR000120FUGRO SOUTH, INC. ii 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: PROJECT: REPORT NO: Carrollton - Farmers Branch lSD c/o Del-Mac Construction Riverchase Elementary School, Coppell, Texas 12 DATE: January 20, 2000 PROJECT NO: 0791-2184 PAGE 1 Owner: Architect: Engineer: Contractor: Fabricator: Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on ~Str I Steel - Metal Deck Units) or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See attached Field Re~orts for Soeciflc Items In-___,~-ted or Tested and T_v~e of Inspection or Teetinu .erformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type deviations noted during Inspection. which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI inspected By: Doug Post, AWS/Certitiad Welding Inspector, ASNT/Certified Level 2 (UT, MT) Distribution: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis f City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Doug Post STR-1 FUGRO SOUTH, INC. i 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: January 20, 2000 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 REPORT NO: 12 PAGE 2 Number Description Location Deviate From Corrective Action Taken I Item deleted. In compliance 2 Item deleted. In compliance 3 Anchor bolts too short in Foundation Drawings length to receive a full nut Area C grid 1/4/00 G@14, J@15 NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWSlCertified Welding Inspector, ASNTICertified Level 2 (UT, MT) STR-1 FUGRO SOUTH, INC. FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: L~. DATE: ~.- ~- PROJECT: -- ! ~'~R r~Y'-~ ~ PROJECT NO: REPORT NO: / ~ - PAGE _.~ OF, Type of In~pegtlon I,.ecMJo~ In j Non - · , Cempllance CempIlan¢, I C~ ~on I Che~ ~ZI ofW~ ~ She~ na~d v,~i~ten a[ lime of inspeclion by I=ield lnspe=to~ will De su~rnittl~ IS iS and n4~ typH ~' iA ~ = In C~moli&nc, i X in bo= = N~n compliance } See NOn r.,omplia~cm report Inspected By: Doug Post, AWSlCe~illed Welding Inspects. ASNTICe~fled Leve4 2 (UT. MT) STR-2 FUGRO SOUTH, INC. _~__~0_ vlrgo lane: ~ Texas 7~229 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: ~&U [[~ _. DATE:.. t.~ ,~.~ PROJECT: ~.~:~.~S=- _ .... PROJECT NO: ~ 2~/7 ~/~ PAGE Re0o~ will ~e su~n~ffed as is and flor typed X in box · Non compliance ) Se~ N~ complia~c~ reign Inspected By; Doug Post, AWSlCe~f~ect Wllc]lnG InspectOr. ASN'r/ce~fled Level 2 (UT. MT) STR.3