SC-CFBISD Riverchase-LR000120FUGRO SOUTH, INC.
ii
2880 Vlrgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT:
PROJECT:
REPORT NO:
Carrollton - Farmers Branch lSD c/o Del-Mac Construction
Riverchase Elementary School, Coppell, Texas
12
DATE: January 20, 2000
PROJECT NO: 0791-2184
PAGE 1
Owner:
Architect:
Engineer:
Contractor:
Fabricator:
Carrollton - Farmers Branch
SHW Group, Inc.
SHW Group, Inc.
DaI-Mac Construction
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on ~Str I Steel - Metal Deck Units) or
Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project
specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI.
See attached Field Re~orts for Soeciflc Items In-___,~-ted or Tested and T_v~e of Inspection or Teetinu .erformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: X
In Compliance
Non Compliance X
Note: Workmanship type deviations noted during Inspection. which are being corrected at time of Inspection, are not being listed on Report.
NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing
Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI
inspected By: Doug Post, AWS/Certitiad Welding Inspector, ASNT/Certified Level 2 (UT, MT)
Distribution:
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis f
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell
Doug Post
STR-1
FUGRO SOUTH, INC.
i
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
NON - COMPLIANCE REPORT
CLIENT: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: January 20, 2000
PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184
REPORT NO: 12 PAGE 2
Number Description Location Deviate From Corrective Action Taken
I Item deleted. In compliance
2 Item deleted. In compliance
3 Anchor bolts too short in Foundation Drawings
length to receive a full nut Area C grid
1/4/00 G@14, J@15
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
Inspected By: Doug Post, AWSlCertified Welding Inspector, ASNTICertified Level 2 (UT, MT)
STR-1
FUGRO SOUTH, INC.
FIELD ERECTION - MEMBERS INSPECTED or TESTED
CLIENT: L~. DATE: ~.- ~-
PROJECT: -- ! ~'~R r~Y'-~ ~ PROJECT NO:
REPORT NO: / ~ - PAGE _.~ OF,
Type of In~pegtlon I,.ecMJo~ In j Non -
· , Cempllance CempIlan¢,
I
C~ ~on
I
Che~ ~ZI ofW~ ~ She~
na~d v,~i~ten a[ lime of inspeclion by I=ield lnspe=to~
will De su~rnittl~ IS iS and n4~ typH
~' iA ~ = In C~moli&nc, i
X in bo= = N~n compliance } See NOn r.,omplia~cm report
Inspected By: Doug Post, AWSlCe~illed Welding Inspects. ASNTICe~fled Leve4 2 (UT. MT)
STR-2
FUGRO SOUTH, INC.
_~__~0_ vlrgo lane: ~ Texas 7~229
FIELD ERECTION - MEMBERS INSPECTED or TESTED
CLIENT: ~&U [[~ _. DATE:.. t.~ ,~.~
PROJECT: ~.~:~.~S=- _ .... PROJECT NO: ~ 2~/7 ~/~
PAGE
Re0o~ will ~e su~n~ffed as is and flor typed X in box · Non compliance ) Se~ N~ complia~c~ reign
Inspected By; Doug Post, AWSlCe~f~ect Wllc]lnG InspectOr. ASN'r/ce~fled Level 2 (UT. MT)
STR.3