Loading...
SC-CFBISD Riverchase-LR000114FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: PROJECT: REPORT NO: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction Riverchase Elementary School, Coppell, Texas 11 DATE: January 14, 2000 PROJECT NO: 0791-2184 PAGE 1 Owner: Architect: Engineer: Contractor: Fabricator: Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction Location of Project: Coppell. Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on iStr I Steel - Metal Deck Unitsl or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. See aria;heal Field Reoorts for S=eciflc Items Inspected or Tested and Tv~e of Inseection or T®stin..erformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type deviations noted during Inspection, which are being con-ected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/CertJfied Level 2 (UT, MT) Distribution: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Pa.y~e City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Doug Post STR-1 FUGRO SOUTH, INC. 2880 Vlrgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: January 14, 2000 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 REPORT NO: 11 PAGE 2 Number Description Location Deviate From Corrective Action Taken I Item deleted. In compliance 2 Item deleted. In compliance 3 Anchor bolts too short in Foundation Drawings length to receive a full nut Area C grid 1/4/00 G@14, J@l 5 NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Cerlifled Welding Inspector, ASNTICertified Level 2 (UT, MT) STR-1 FUGRO SOUTH, INC. FIELD ERECTION - MEMBERS IN~SI:'ECTED or TESTED CLIENT: ~,, _. DATa: 1- 1~-~ PROJECT: ~ PROJECT NO: o?q/- REPORT NO: jr/ ............ PAGE ~ OF ...~, ~ In Non ~ of Inapec~on Location C~ecx ~eaM ~~ ~ Che~ Er~ P~ur~ ~e~ Webers ~alM~d~ ~ual ~ ~ W~ ~ ~ S~ __ ~a ~ ~ W~a ~ ~ ~t , visuat Ouali~ ~ Wel~ o~ R~f ~ -- ~ ~ ~ S~ ~We~ ~ S~ MaG P~I r~ng of w~ Re~o~t .=i# ~e s~bmiRed Is is a~d not typed X in t~x n N~, ~m011a~ce } See No~ c=mpliaf, ct repo~t Inspected By; Doug Post, AWS/Ce~fled Wel~lb~g InSO~r. ASNTICe~ilied Level 2 (UT. MT) STR.2