Loading...
SC-CFBISD Riverchase-LR000104FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o Del-Mac ConstructionREPORT DATE: January 4, 2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: December 30, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab on Deck - All of Area "A" - Slab on Deck following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 4:25 a.m. 9:05 a.m. 180 5.0 to 5.5 5.0 Pioneer - Plant No. 29 & 22 55 - 58°F 4000/28 16 No Michael Overstreet Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard Del-Mac Construction - Nate/Oayne City of Coppell - Larry Davis ~ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 REINFORCING STEEL PLACEMENT OBSERVATION Carrollton-Farmers Branch lSD, cio DaI-Mac ConstructionREPORT DATE: January 5, 2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: Deember 30, 1999 General Contractor: Method of Test: Results / Remarks: DaI-Mac, Striland Applicable ACl Recommendations and ASTM Standards On the above sample date, a representative of Fugro South observed the reinforcing steel placed at the following location: · Entire Slab on Deck of Area "A" The steel was checked for proper size, grade, quantity, vertical location, horizontal spacing, correctness of bends and splices, firmness and security of support and ties and clearances between reinforcement and forms. No discrepancies were noted this date. Michael Overstreet Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. PROJECT: Riverchase Elementary School, Coppell, Texas REPORT DATE: January 4, 2000 PROJECT NO: 0791-2184 SAMPLE DATE: December 3, 1999 CONTRACTOR: DaI-Mac TICKET NO.: 385559 AMBIENT TEMP. (°F): 62 CONCRETE TEMP. (°F) (ASTM C-1064): 69 TIME BATCHED: 4:00 TIME SAMPLED: 4:35 WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): Slab on Deck - Area "D" on southeast comer Pioneer 29/1880 9704 150 5.0 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) . . REC 197 3 12-6-99 77000 2720 3000/28 daYs REC 198 5 12-8-99 92000 3250 REC 199 28 12-31-99 121850 4310 REC 200 28 12-31-99 125200 4430 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ [~ r---] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: ~ DaI-Mac ~onstruction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis/ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. PROJECT: Riverchase Elementary School, Coppell, Texas REPORT DATE: January 4, 2000 PROJECT NO: 0791-2184 SAMPLE DATE: December 3, 1999 CONTRACTOR: DaI-Mac TICKET NO.: 385567 AMBIENT TEMP. (°F): 60 CONCRETE TEMP. (°F) (ASTM C.10~4): 70 TIME BATCHED: 5:45 TIME SAMPLED: 6:30 WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Pioneer PLANT/TRUCK: 29 / 2 MIX ID NUMBER: 9704 AIR (%) (ASTM C-231.): WATER ADDED (gal): 75 SLUMP (in.) (ASTM C-'143): 5.5 Slab on Deck - 15 feet west and 20 feet south from northeast corner Area "D" CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 201 3 12-6-99 78000 2760 3000/28 days REC 202 5 12-8-99 80000 2830 REC 203 28 12-31-99 104000 3680 REC 204 28 12-31-99 101800 3600 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~] ~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman SMH/bg Distribution: FUGRO SOUTH INC. Reviewed By:~'~] DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. PROJECT: Riverchase Elementary School, Coppell, Texas REPORT DATE: January 4, 2000 PROJECT NO: 0791-2184 SAMPLE DATE: December 3, 1999 CONTRACTOR: DaI-Mac TICKET NO.: 385571 AMBIENT TEMP. (°F): 64 CONCRETE TEMP. (°F) (ASTM C-10S4): 69 TIME BATCHED: 6:25 TIME SAMPLED: 7:05 WEATHER CONDITION: Partly Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231): WATER ADDED (gal): SLUMP (in.) (ASTM C-143): Pioneer 20 / 1912 9704 3O 5.0 Slab on Deck - Area "D" - 30 feet south and 5 feet east from northwest comer CONCRETE CYLINDER COMPRESSIVE sTRENGTH TESTS standard 6" x 12", 28.27 square inches ' ~ TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH ,,NUMBER (days) TESTED (pounds) (psi) (psi) REC 205 3 12-6-99 68000 2410 3000/28 days REC 206 5 12-8-99 73000 2580 REC 207 28 12-31-99 90180 3190 REC 208 28 12-31-99 89400 3160 Fracture mode is (A) unless otherwise noted Specificati°ns: Making & ASTM C'31 Testing ASTM C-143, Typesof [~ [~] 71 r--~ cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Liliard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: REPORT NO: STRUCTURAL STEEL INSPECTION REPORT Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: January 4, 2000 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 10 PAGE 1 Owner: Architect: Engineer: Contractor: Fabricator: Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Vieual Inspection of Welds on (Str I ~teel - Metal Deck Units~ or Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. ~ee attached Field Reoorts for S~ectflc Items In-___nectad or Tested and Tv~e of Insoection or Teetin~ ;~erformed Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested. Results of Inspection: Project Complete Project Incomplete Fabrication Is: Erection Is: X In Compliance Non Compliance X Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to verify compliance to Project specifications, Contract Documents, Drawings, and Governing Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certifled Level 2 (UT, MT) Distribution: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate/Payne City of Coppeil - Larry Davis/ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Doug Post STR-1 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 NON - COMPLIANCE REPORT CLIENT: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: January 4, 2000 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 REPORT NO: 10 PAGE 2 Number Description Location Deviate From Corrective Action Taken 1 Mislocation of bolt holes. Area C Drawings Corrections have been made per Required number of bolts or foundation level RFI #76. Visual quality of welds are 12/27/99 all bolts could not be L @ 12 beam ~n compliance installed to beam web 2 Bolt holes at expansion joint Area C roof Drawings Make corrections per attached on joist base plate angles between 12 & Vulcraft Fix-It dated 12/21/99 12/27/99 have been omitted. Joist to 15 @ W beam top flange at expansion joint ... NOTE: Architect and Engineer should advise on acceptability of all noted deviations Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) STR-1 FUGRO SOUTH, INC. 2~80 Virgo Lane; Dallas. Texa~ 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: N~'~t3J3~--] ~ ~%'{'o DATE: [ -- PROJECT: "~~~ ~..,~[.w~l~,,.i~P-'~ ~'~cJ~''~'~ PROJECT NO: REPORT NO: ' /g~ ~. PAGE ~OF I In I Non Type of Inspection I Location Compliance Compliance Check NutS on Anchor Bolts / Tight Check Erection Procedures Check for Damaged Members Check Welders Qualification Re¢-,3rds Cl~eck Fit-Up of Welded Comle_~-ons ,,. Visual Quality of Welds on S~-'-'~-J~al Steel visual Quality of We!cL~_ on JoistS / Girders Visual Quality of Welds on Misc Steel visual Quality of We!d-_ on Pre Cast Connection Visual Quality of Welds on Composite Deck '~'_~, ~ ~'.D -- '~ ;~ IMI ' vis,,a~ Qua~i~ of Welds on Roo~ O.ck ~lisual Quality of Welds on Shear S",", Check Size of Welds on Structural Steel Check Size of Welds on Joi._~tS / Girdem Check $iz_- of Welds on Mist Steel Check Size of Welds on Pre Cast Connection Check Size of Welds on Composite / Roof Deck Check Size of Welds on Shear Studs Ultrasonic Testing of Welds Re~o~ ~and written at time of inspection by Fielcl Inspector ~' in box = In corn; mca Re~,crt will ~e submitted as is and not typed X in ~3ox = Non compliance } See Non compliance rep(3~ Inspected By: Doug Post, AWS;Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) STR-2