SC-CFBISD Riverchase-LR 991227FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT:
PROJECT:
REPORT NO:
Carrollton - Farmers Branch lSD c/o DaI-Mac Construction
Riverchase Elementary School, Coppell, Texas
9
DATE: December 27, 1999
PROJECT NO: 0791-2184
PAGE 1
Owner:
Architect:
Engineer:
Contractor:.
Fabricator:
Carrollton - Farmers Branch
SHW Group, Inc.
SHW Group, Inc.
DaI-Mac Construction
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspection of Welds on ($tr I Steel - Metal Deck Units1 or
Ultrasonic Testing or Magnetic Particle Inspection of Welds and Inspection of Bolted Connections for compliance to Project
specifications, Contract Documents. Drawings, and Governing Codes } AW~, AISC, A~TM, SJI, ASNT, ANSI.
See attached Field Reoorts for $oeclltc Items Insm~cted or Tested and T¥1~e of Ins~ection or Testina performed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: X
in Compliance X
Non Compliance
Note: Workmanship type deviations noted during Inspection, which are being corrected at time of Inspection, are not being listed on Report.
NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents, Drawings, and Governing
Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI
Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
Distribution:
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell
Doug Post
STR-1
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
CLIENT:
PROJECT:
REPORT NO:
NON - COMPLIANCE REPORT
Carrollton - Farmers Branch lSD c/o DaI-Mac Construction
Riverchase Elementary School, Coppell, Texas
9
DATE: December 27, 1999
PROJECT NO: 0791-2184
PAGE 2
~iumber Description Location Deviate From Corrective Action Taken
1 Mislocation of bolt holes. Area C Drawings Corrections have been made per
Required number of bolts or foundation level =[FI #76. Visual quality of welds are
12/27/99 all bolts could not be L @ 12 beam ;n compliance
installed to beam web ....
2 Bolt holes at expansion joint ~,rea C roof Drawings Make corrections per attached
on joist base plate angles between 12 & Vulcraft Fix-It dated 12./21/99
12/27/99 have been omitted. Joist to 15 @ W
beam top flange at
expansion joint
NOTE: Architect and Engineer should advise on acceptability of all noted deviations
Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
STR-1
FUGRO SOUTH, INC.
2880 Virgo Lane; Oallas, Texas 75229
Ph (972} 484-8301: Fax (972~ 620-;'328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
CLIENT: ~-~D,oc.{~ t~(C) DATE: t-'c./z'[ l qt~-
PROJECT: ~'~c. Jn~£ Et,-Erv~¢~",~, ~--[-~. PROJECTED: 43 '~/:~loC"/',/
REPORT NO: c~ I PAGE~.~ OF
In ! Non
Type of Inspection I Location Compliance Compliance
Check Bolt Tightening Pn3cedure
Check Bolt Tightness with Torque Wr~nctt
Visual InSl3eClJOn of Tension Coatml
Beadng Bolted Connec~ons / Snug Tight
Check Bolted Connection I Turn of Nut
Check Size. Leng~, and No. of She~' Studs
Check Gauge of Comi3osite Deck
Check Gauge of Roof Deck
Check Size Lei3 on Roof Deck
Check Installation of Bddging on Joists / Girders
Check Installation of Exga~sion Anctlors
Check Grout
Re¢ort hand written at time of insl:mction by Field Inspector
Report will 0e submitted as is and not typed
~' in box = In compliance
X in box = Non compliance } See Non compliance report
Inspected By: Doug Post, AWS/Certifled Welding inspector. ASNT/Ce~fied Level 2 (UT, MT)
STR-3
FUGRO SOUTH, INC.
2880 Virgo Lane;
(972) 4,84-8301; Fax (972) 620-7~28
FIELD ERECTION- MEMBERS INSPECTED or TESTED
PROJECT: ~,.~_p_c_~.q_%E .~[~r,.,(~.,~'t",~e.~ ~-c~ ! PROJECT NO:
REPORT NO-: , (~ ~. PAGE ~'~ OF
¢
Type of Inspection I L°(:'lfl°n t In I Non
Compliance Compliance
~ ~or 8olt Group
Visual ~uali~/of We!d~ on Roof Oe~
-
Check ~iz. af Welas an Shear ~,d~
Ul~sonic Te,~ng of Weids
Mag ~a~e Tes~ng of WeI~s
time of in$gec~on ~y ~elct InsDec:or
sul=m~e"J as is and not ~eC
~' in ~ox = in comDliance
X in ~Ox = NOn c~mpliance } See Non comptianca re'c. crt.
tns;~ected :3y: [DOug Post, AWS,'Ce~fied Welciing Inspector. ASNT/Ce~fie¢ Levet 2 (L;T. MT)
57~-2
I
TETi:~L P. 04
To:
From'
IRe.
',,V. xU L C R A F T /<'"
a ¢~4si=a af NUCOR mr~xx~t~'.n
9550 Ski#man, Suite 506, Dallas, Texas 75243 (214) 340-1883
1:2
December 21. 1999
Garth Rogers
972-745-7764
Riverch~e Elen~ntary
Our ~le J35-99-0947
The following ~s a fix for tl~ exparmion joint which vail allow the JOist to move lengthwise
as the Mots were intende;I to do.
'l'lti~ is not authorization for ;my charges to VjIcraft. Please advise us of any charges for
fiek:l tatx)r mior lo I~egir~ning the w'ark.
Please c~JI if you have any quesliort$.
Tel 214/3,~,0-1883 Fax 2141340-5897