Loading...
SC-CFBISD Riverchase-LR 991220FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: December 20, 1999 Project No.: 0791-2184 SAMPLE DATE: November 19, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: ASTM C-109 South wall on gymnasium row 46 7:10 am Time Sampled: Type S 7:15 am SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 205 7 11/26/99 4.0 6030 1510 1800/28 REC 206 7 11/26/99 4.0 6250 1560 REC 207 7 11/26/99 4.0 6300 1580 REC 208 28 12/17199 4.0 7500 1880 REC 209 28 1 2/17/99 4.0 7650 1910 REC 210 28 12/17/99 4.0 7750 1940 Remarks: Temperature: Ambient 74° Temperature: Mortar 72° William Granger Technician SMH/rm Distribution: DaI-Mac Construction - Jaso~ Lillard City of Coppell - Larry Davis ' SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carroltton-Farmers Branch lSD, c/o DaI-Mac Construction REPORT DATE: December 20, Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: December 17, 1999 General Contractor: Method of Test: DaI-Mac Aq~plicable ACI Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Area 4 - Floor Deck following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 4:00 a.m. 8:35 a.m. 148 3.75 - 6.0 5.5 Pioneer - Plant No. 22 65 - 72°F 3OOO/28 12 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/br Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell