Loading...
SC-CFBISD Riverchase-LR 991213FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: December 13, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: November 10, 1999 CONTRACTOR: TICKET NO.: 384785 AMBIENT TEMP. (°F): 75 CONCRETE TEMP. (°F) (ASTM C.1064): 70 TIME BATCHED: 8:20 TIME SAMPLED: 9:20 WEATHER CONDITION: sunny LOCATION OF PLACEMENT: Striland Construction CONCRETE SUPPLIER: Pioneer PLANT/TRUCK: 29/923 MIX ID NUMBER: 9704 AIR (%) (ASTM C-231): WATER ADDED (gal): 2.5 SLUMP (in.) (ASTM C-143): 5 Paved on the gym floor on grid line 2 A 5.5 on line 13 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12', 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 193 7 11-17-99 90000 3180 4000/28 days REC 194 28 12-8-99 116000 4100 REC 195 28 12-8-99 114000 4030 REC 196 Hold Fracture mode is (A) unless other,vise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ ~ ~ Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Julio Perez SMHtrm Distribution: FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate/Payne City of Coppell - Larry Davis-- City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: December 13, 1999 Project No.: 0791-2184 SAMPLE DATE: November 10, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results / Remarks: Dal Mac ASTM C-109 Gymnasium north side row 31 7:10 am Time Sampled: Type S 7:27 am SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 175 7 11/17/99 4.0 6680 1670 1800/28 REC 176 7 11/17/99 4.0 6715 1679 REC 177 7 11/17/99 4.0 6750 1687 . .REC 178 28 12/08/99 4.0 10100 2530 REC 179 28 12/08/99 4.0 9940 2490 REC 180 28 1 2/08/99 4.0 10210 2550 Remarks: Temperature: Mortar 66° Temperature: Ambient 64° William Granger Technician FUGRO SOUTH INC. SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell Reviewed By: DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: December 13, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: December 10, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Deck Slab on Area "B" following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superptasticizer used: 4:00 a.m. 10:00 a.m. 180 4.5 -5.5 5.0 Pioneer 57 - 59°F 4000/28 16 No Bob Shea Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Litlard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell