SC-CFBISD Riverchase-LR 991123FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Vlrgo Lane; Dallas, Texas 75229
Ph (972) 484.8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF MORTAR CUBES
Carrollton-Farmers Branch lSD, c/o DaI-Mac Const.
Riverchase Elementary School, Coppell, Texas
Report Date: November 23, 1999
Project No.: 0791-2184
SAMPLE DATE: October 25, 1999
Contractor:
Method of Test:
Sample Location:
Time Batched:
Results I Remarks:
DaI-Mac
ASTM C-109
Block Wall-Line 16.5 from AJ to AL (Area D)
11:00 a.m. Time Sampled: 11:30 a.m.
Type S
SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED
NUMBER TESTED LOAD STRENGTH STRENGTH
(days) (sq. in.) (lbs.) (psi) (psi/days)
REC 103 7 11-01-99 4.0 7000 1750 1800/28
REC 104 7 11-O1-99 4.0 6840 1710
REC 105 7 11-01-99 4.0 6770 1693
REC 106 28 11-22-99 4.0 8830 2210
REC 107 28 11-22-99 4.0 8590 2150
REC 108 28 11-22-99 4.0 8640 2160
Remarks:
Mark Strittmatter
Technician
SMH/rm
Distribution:
DaI-Mac Construction - Jason Lillard
City of Coppell - Larry Davis//
SHW Group - Joe Craddock
Carrollton - Farmers Branch lSD - Tom Bell
FUGRO SOUTH INC.
Reviewed By: I
DaI-Mac Construction - Nate Payne
City of Coppell - Lee Stone
SHW Group - Terry Hoyle
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas. Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF GROUT CYLINDERS
CLIENT: Carroliton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: November 23, 1999
PROJECT: Riverchase Elementary School, Coppell, Texas Project NO.: 0791-2184
SAMPLE DATE: October 25, 1999
Dal Mac
CONTRACTOR:
TICKET NO.:
AMBIENT TEMP. (°F): 77
GROUT TEMP. (°F): 72
TIME BATCHED: 12:45 pm
TIME SAMPLED: 1:00 pm
WEATHER CONDITION: Clear
LOCATION OF PLACEMENT:
GROUT SUPPLIER:
PLANT/TRUCK:
MIX ID NUMBER:
AIR (%) (ASTM C-231)
WATER ADDED:
SLUMP (inches) (ASTM C-143)
On Site
0
8.50
Block cell, Line 16.5 from AJ to AL approximately 18 feet to 20 feet above
finish floor
GROUT CYLINDER COMPRESSIVE STRENGTH TESTS
Standard 3" x 6", 7.07 square inches
CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE ' REQUIRED COMPRESSIVE
NUMBER (days) TESTED (pounds) STRENGTH STRENGTH
(psi) (psi)
REC 61 7 11/01/99 21360 3021 2500/28 days
REC 62 7 11101/99 21480 3038
REC 63 28 11/22/99 28640 4050
REC 64 28 11/22/99 28830 4080
Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39
Curing:
REMARKS:
Technician: Mark Strittmatter
FUGRO SOUTH, INC.
Reviewed By:~
SMH/rm
Distribution:
DaI-Mac Construction - Jason Lillard
City of Coppell - Larry Davis
SHW Group - Joe Craddock
Carrollton - Farmers Branch lSD - Tom Bell
DaI-Mac Construction - Nate Payne
City of Coppell - Lee Stone
SHW Group - Terry Hoyle