Loading...
SC-CFBISD Riverchase-LR 991119FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o Dai-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: November 19, 1999 Project No.: 0791-2184 SAMPLE DATE: November 10, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results / Remarks: Dal Mac ASTM C-109 Gymnasium north side row 31 7:10 am Time Sampled: Type S 7:27 am ~AMPLE AGE DATE AREA APPLIED C0MPRESSlVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (scI. in.) (lbs.) (psi) (psi/da)s) REC 175 7 11/17/99 4.0 6680 1670 1800/28 REC 176 7 11/17199 4.0 6715 1679 REC 177 7 11/17/99 4.0 6750 1687 REC 178 28 12/08/99 4.0 REC 179 28 12/08/99 4.0 REC 180 28 12/08/99 4.0 Remarks: Temperature: Mortar 66° Temperature: Ambient 64° William Granger Technician SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: ~/ DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: November 19, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: October 15' 1999 CONTRACTOR: DaI-Mac TICKET NO.: 353648 AMBIENT TEMP. (°F): 92 CONCRETE TEMP. (°F) (ASTM C.1064): 64 TIME BATCHED: 12:45 TIME SAMPLED: 1:10 WEATHER CONDITION: clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: Pioneer PLANT/TRUCK: 27-758 MIX ID NUMBER: 9351 AIR (%) (ASTM C-231): WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 4.5 Grade beam, grid 15 x K CONCRETE CYLINDER COMPRESSIVE STRENGTH YE.S'i'S Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFi~ COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (p_~_,nds) (psi) (psi) REC 181 7 10-22-99 98000 3470 3000/28 days REC 182 28 11-12-99 121000 4280 REC 183 28 11-12-99 122000 4320 REC 184 Hold Fracture .mod__e is (A) unless othenvise noted Specifications: Making & ASTM C-31 Testing ASTM C'143, Typesof [~ ~] ~ ~ Cuilr,,~: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: William Granger FUGRO SOUTH INC. Reviewed By: c'~i ~ SMH/kp Distribution: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate~ayne City of Coppell - Larry Davis ~ City of Coppell ~ Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT CLIENT: PROJECT: REPORT NO: Carrollton - Farmers Branch lSD c/o DaI-Mac Construction Riverchase Elementary School, Coppell, Texas 4 DATE: November 19, 1999 PROJECT NO: 0791-2184 PAGE 1 Owner: Architect: Engineer: Contractor: Fabricator:. Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction Location of Project: Coppell, Texas Inspection Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Stl'uctural Steel In.pectlen } VLtual Inspection of Welds on ~Str I Steel - Metal Deck Units) or Ultrasonic Te~ting or Magnetic Pa~Jcle Inspection of Welds and Inspection of Bolted Connections for c~mpilance to Project specifications, Contract Documents, Drawings, and Governing Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. ~.) attached Field Re=efts for Srmcific Items I~*~-~c~ed or Tested end Tvoe of Insaection or Testina r~orformed Location of Inspection: See attached Field reports for Specific Areas Inspected Or Tested. Results of Inspection: Project Complete i Project Incomplete Fabrication Is: x Erection Is: In Compliance X Non Compliance Note: Workmanship type deviations noted dudng Inspection, which are being corrected at time of Inspection, are not being listed on Report. NOTE: Inspection was performed to vedfy compliance to Project specifications. Contract Documents. Drawings. and Governing Codes} AWS. AISC, ASTM. SJL. ASNT. ANSI Inspected By: Doug Post, AWS/Cer~ed Welding Inspector, ASNT/Certified Level 2 (UT. MT) Distribution: DaI-Mac Construction - Jason Lillard Dal-Mac Construction - Nate/Payne City of Coppell - Larry Davis/ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Doug Post STR-1 ,-", ---. UU FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: -'~/~;11' '(,~,,~P~ DATE= . t~.l. lo~/c~ PROJECT: .'/'~J2~,c_~4~. El,~',~w. -~~( PROJECTNd: O~.~)- 2/~ REPORT NO:'~ PAGE __ OF In N~n Type of Inspection Location Compliance ComPliance Ch~ ~t ~gh~ Visual Insp~ Ch~ Gap on L~ I~i~ Washem Ch~ Size. ~ng~. Ch~ G~ge of C~ Gauge of ~f Che~ Size ~p Ch~ Ins~lla~ of Balding on Jois~ / Ch~ I~mlla~ of ~panN~ Che~ G~ut Report hand wdtten at time of inspection by Field Inspector Report will be submitted as is and not typed ~/' in box = In compliance X in box = Non compliance } See Non compliance report Inspected By: Doug Post, AWSICertified Welding Inspector. ASNT/Certified Level 2 (UT. MT) STR-3 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: Carrollton-Farmers Branch lSD, c/o Dat-Mac Const. Report Date: November 19, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas Project No.: 0791-2184 SAMPLE DATE: October 18, 1999 Dal Mac CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 60 GROUT TEMP. (°F): 74 TIME BATCHED: 11:05 TIME SAMPLED: 11:15 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: Gymnasium wall GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C.231) WATER ADDED: SLUMP (inches) (ASTM C-143) GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square Inches CYLINDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 41 7 10/25/99 25700 3635 2500/28 days REC 42 7 10/25/99 25770 3654 REC 43 28 11/15/99 37000 5230 REC 44 28 11/1 5/99 36600 5180 Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39 Cudng: REMARKS: Technician: William Granger FUGRO SOUTH, INC. Reviewed By~ SMH/rm Distribution: DaI-Mac Construction - Jasor~ Liliard City of Coppell - Larry Davis t SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle