SC-CFBISD Riverchase-LR 991116FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
STRUCTURAL STEEL INSPECTION REPORT
CLIENT:
PROJECT:
REPORT NO:
Carrollton - Farmers Branch lSD c/o DaI-Mac Construction
Riverchase Elementary School, Coppell, Texas
3
DATE: November 16, 1999
PROJECT NO: 0791-2184
PAGE I
Owner:
Architect:
Engineer:
Contractor:
Fabricator:
Carrollton - Farmers Branch
SHW Group, Inc.
SHW Group, Inc.
DaI-Mac Construction
Location of Project: Coppell, Texas
Inspection Performed At: Job Site X Fabrication Shop
DESCR#rrtON OF INSPECTION: Structural Steel Irtspectlon } Vllual In~pection of Welds on {Str,I Steel - Metal Deck Units~ or
Ultrasonic Testing or Magnetic Particle Inspection of Welds and In~pection of Bolted Connections for compliance to Project
specifications, Contract Documents, Drawings, and Governing Codee } AWS, AISC, ASTM, SJI, ASNT, ANSI.
See attached Field Reaorts for S~eciflc Items Ins~ected or Tested and Tvoe of Insesction or Testina n®rformed
Location of Inspection: See attached Field reports for Specific Areas Inspected or Tested.
Results of Inspection: Project Complete Project Incomplete
Fabrication Is:
Erection Is: X
In Compliance X
Non Compliance
Note: Workmanship type deviafiort$ noted dudng Inspection, which are being corrected at time of Inspection, are not being listed on Report.
NOTE: Inspection was performed to vedfy compliance to Project specifications, Contract Documents. Drawings, and Governing
Codes} AWS. AISC, ASTM. SJL, ASNT, ANSI
Inspected By: Doug Post, AWS/Certified Welding Inspector. ASNT/Certifled Level 2 (UT, MT)
Distribution:
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis /
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell
Doug Post
STR-1
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
PROJECT: .--~,u~_C~'A,-,,? ~'lc, r~, ~c~ PROJECm~lO:~/~,~_,~./,f.~
REPORT NO: .~ . PAGE ..~- OF_'~
Type of Inspection Location I In
Compliance I Non
Compliance
Check size and Projection of Anchor Bolt
Check Anchor Bolt Group
Check Nuts on Anchor Bolts / Tight
Check Erection Procedures
Check for Damaged Members
Check Welders Qualification Records
Check Fit-Up of Welded Connections
Visual Quality of Welds on Structural Steel
Visual Quality of Welds on Joists / Girders
Visual Quality of Welds on Misc Steel
Visual Quality of Welds on Pre Cast Connection
Visual Quality of Welds on Composite Deck
Visual Quality of Welds on Shear Studs
Check Size of Welds on Structural Steel /
!
Check Size of Welds on Joists / Girders
Check Size of Welds on Misc Steel [
Check Size of w~ds on ~re Cast Co..~on
Check Size of Welds on Composite/~r'O~f
Check Size of Welds on Shear Studs
Ultrasonic Testing of Welds
Mag Particle Testing of Welds
Report hand wdtten at time of inspection by Field Ins )ector V' in box = In compliance
Report will be submitted as is and not typed X in box = Non compliance } See Non compliance report
Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT)
STR-2
FUGRO SOUTH, INC.
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
FIELD ERECTION - MEMBERS INSPECTED or TESTED
PROJECT: (~L[/~.~-~E.- ~E,,-, , E~c.~=,.~ PROJECT
REPORT NO: ~ PAGE ~ OF
In Non
Type of Inspection Location Compliance Compliance
Check Bolt Tightening Procedure
Check Connection for Required Size of Bolts
Check Connection for Required No. of Bolts
Check Bolt Tightness with Torque Wrench
Visual Inspection of Tension Control Bolts
Bearing Bolted Connections / Snug Tight
Check Bolted Connection /Tum of Nut
Check Gap on Loaded Indicator Washers
Check Size, Length, and No. of Shear Studs
Check Gauge of Composite Deck
Check Gauge of Roof Deck
Check Size Lap Connection on Composite Deck
Check Size Lap on Roof Deck ~::~r ,,,~,'~ ~ ~
Check Installation of Bddging on Joists / Girders ~
Check Installation of Expansion Anchors
Check Grout
Report hand wdtten at time of inspection by Field Inspector
Report will 13e submitted as is and not typed
,~ in box = In compliance
X in box = Non compliance } See Non compliance report
Inspected By: Doug Post, AWSICertified Welding Inspector. ASNTICertified Level 2 (UT, MT)
STR*3