SC-CFBISD Riverchase-LR 991112FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
OBSERVATION OF CONCRETE PLACEMENT
Carrollton-Farmers Branch lSD, c,/o DaI-Mac Constr. REPORT DATE: November 12, 1999
Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184
DATE PERFORMED: NOvember 10, 1999 J
General Contractor: Striland Construction
Method of Test:
Applicable ACl Recommendations and ASTM Standards
Results I Remarks:
Concrete placement observation was performed at the Slab - Pd. all of gym from Grid Line 3-5.6 to 5-5.5 and
following location: Line 17.5 to 12.5
Time placement began:
Time placement ended:
Total cubic yards placed:
Slump range (inches):
Slump required (inches):
Concrete supplier and plant:
Concrete temperature range (°F):
Strength required (psi/days):
Number of cylinders made:
Superplasticizer used:
8:30 a.m.
12:00 noon
70
5.0 - 6.0
5.0
Pioneer - Plant No. 29
70+1°F
4000/28
4
No
Julio Perez
Fugro South Technician
FUGRO SOUTH, INC.
SMH/bg
Distribution:
Reviewed By: ~--------'----
DaI-Mac Construction - Jason Lillard
DaI-Mac Construction - Nate Payne
City of Coppell - Larry Davis
City of Coppell - Lee Stone
SHW Group - Joe Craddock
SHW Group - Terry Hoyle
Carrollton - Farmers Branch lSD - Tom Bell