Loading...
SC-CFBISD Riverchase-LR 991112FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c,/o DaI-Mac Constr. REPORT DATE: November 12, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: NOvember 10, 1999 J General Contractor: Striland Construction Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the Slab - Pd. all of gym from Grid Line 3-5.6 to 5-5.5 and following location: Line 17.5 to 12.5 Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 8:30 a.m. 12:00 noon 70 5.0 - 6.0 5.0 Pioneer - Plant No. 29 70+1°F 4000/28 4 No Julio Perez Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: ~--------'---- DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell