Loading...
SC-CFBISD Riverchase-LR 991105FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: November 5, 1999 Riverchase Elementary School, Coppell, Texas Project No.: 0791-2184 SAMPLE DATE: October 7, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results / Remarks: Dal Mac ASTM C-109 25th course west side gymnasium wall 11:30 Time Sampled: Type S 11:40 SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH {days) {sq. in.) (lbs.) (psi) (psi/days) REC 31 7 10/14/99 4.0 7700 1920 1800/28 REC 32 7 10/14/99 4.0 7590 1900 REC 33 7 10/14/99 4.0 7650 1910 REC 34 28 11/04/99 4.0 13870 3470 REC 35 28 11/04/99 4.0 13580 3400 REC 36 28 11/04/99 4.0 13610 3400 Remarks: David Putman Technician SMH/rm Distribution: DaI-Mac Construction - Jaso~ Lillard City of Coppell - Larry Davis ~ SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: ~ -- DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: November 5, 1999 Project No.: 0791-2184 SAMPLE DATE: October 7, 1999 General Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Dat-Mac Construction / Berkel ASTM C-109 25th course west side gymnasium wall 11:20 Time Sampled: Type 11:35 SAMPLE AGE DATE AREA 'APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. !n.) (lbs.) (psi) (psi/days) REC 21 7 10/14199 4.0 25000 3540 2000/28 REC 22 28 11/04/99 4.0 38140 5400 REC 23 28 11/04/99 4.0 38210 5400 REC 24 Hold 4.0 Remarks: William Putman Fugro South Technician FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ,~"7~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD -Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas REPORT DATE: November 5, 1999 PROJECT NO: 0791-2184 SAMPLE DATE: October 7, 1999 CONTRACTOR: Dal Mac TICKET NO.: 1402100 AMBIENT TEMP. (°F): 79 CONCRETE TEMP. (°F) (ASTM C.1064): 73 TIME BATCHED: 7:38 TIME SAMPLED: 8:10 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/451 MIX ID NUMBER: 8273 AIR (%) (AST¥ C-231): 4.8 WATER ADDED (gal): 5 SLUMP (in.) (ASTM C-143): 4.25 Paving: 60 Feet south, 30 feet east from northeast comer of school CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (pounds) (psi) (psi) REC 157 4 10/11/99 90000 3180 3600/28 days REC 158 7 10/14/99 110000 3890 REC 159 28 11/04/99 147000 5200 REC 160 28 11/04/99 149000 5270 Fracture mode is (A)'unless otherwise noted Spedfications: Making & ASTM 0-31 Testing ASTM 0-143, Typesof [~ ~ 0~ Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman SMH/rm Distribution: FUGRO SOUTH INC. Reviewed By~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas REPORT DATE: November 5, 1999 PROJECT NO: 0791-2184 SAMPLE DATE: October 7, 1999 CONTRACTOR: Dal Mac TICKET NO.: 1378308 AMBIENT TEMP. (°F): 83 CONCRETE TEMP. (°F) (ASTM C.1064): 75 TIME BATCHED: 8:37 TIME SAMPLED: 9:15 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/806 MIX ID NUMBER: 4.8 AIR (%) (ASTM C-231): WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 4 Paving: 65 feet south, 120 feet east from northeast corner of school CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH , NUMBER (days) TESTED (pounds) (psi) (psi) REC 161 4 10/11/99 81000 2870 3600/28 days REC 162 7 10/14199 100000 3540 REC 163 28 11/04/99 123000 4350 REC 164 28 11/04/99 125000 4420 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Typesof ~;~ FT'I ["~1 r~ curing: Methods: ASTM C-39 Fracture: A[/XJ VXJ V~ LJB c D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: November 5, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: October 7, 1999 CONTRACTOR: Dal Mac TICKET NO.: 1378327 AMBIENT TEMP. (°F): 85 CONCRETE TEMP. (°F) (ASTM C-10~4): 74 TIME BATCHED: 10:25 TIME SAMPLED: 11:15 WEATHER CONDITION: Partly cloudy LOCATION OF PLACEMENT: Paving: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/804 MIX ID NUMBER: 8273 AIR (%) (ASTM C-231): 4.9 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-l~): 4.75 100 Feet south, 175 feet eas from northeast corner of school CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER Idays) TESTED (pounds) (psi) (psi) REC 165 4 10/11/99 66000 2330 3600/28 days REC 166 7 10/14/99 90000 3180 REC 167 28 11/04/99 109000 3860 REC 168 28 11/04/99 107000 3780 Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM 0-31 Testing ASTM C. 143, Typesof [~ [~ [~1E~ , Curing:, Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: David Putman FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: November 5, 1999 Project No.: 0791-2184 SAMPLE DATE: October 6, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Dal Mac ASTM C-109 South side gymnasium wall 20th course 8:40 Time Sampled: Type S 8:55 SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 25 7 10/13199 4.0 12840 3210 1800/28 REC 26 7 10/13/99 4.0 12650 3160 REC 27 7 10/13~99 4.0 12730 3180 REC 28 28 11/03/99 4.0 15440 3860 REC 29 28 11/03/99 4.0 15210 3800 REC 30 28 11/03/99 4.0 15350 3840 Remarks: David Putman Technician SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: Carroliton-Farmers Branch lSD, c/o Dat-Mac Const. Report Date: November 5, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas Project No.: 0791-2184 SAMPLE DATE: October 6, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac GROUT SUPPLIER: 83 PLANT/TRUCK: 80 MIX ID NUMBER: 8:50 AIR (%) (ASTM C-231) 9:00 WATER ADDED: Partly cloudy SLUMP (inches) (ASTM C-143) South side of gymnasium wall 20th course On Site GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYLINDER AGE DATE TOTAL LOAD CO~iP~',ESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 17 7 10/13/99 19990 2830 2500/28 days REC 18 28 11/03/99 34900 4940 . . REC 19 28 11/03/99 34740 4910 REC 20 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Cudng: REMARKS: Technician: David Putman FUGRO SOUTH, INC. SMH/rm Distribution: Reviewed By: ~ ~ DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle