SC-CFBISD Riverchase-LR 991104FUGRO SOUTH, INC.
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF MORTAR CUBES
Carrollton-Farmers Branch lSD, c/o Dal-Mac Const. Report Date: November 4, 1999
Riverchase Elementary School, Coppelt, Texas Project No.' 0791-2184
SAMPLE DATE: October26, 199
Contractor:
Method of Test:
Sample Location:
Time Batched:
Results I Remarks:
C & D Masonry
ASTM C- 109
North side of Gym exterior brick Course 1
1:05 p.m. Time Sampled:
Type S
1:18 p.m.
SAMPLE AGE DATE AREA APPLI'ED COMPRESSIVE REQUIRED'
NUMBER TESTED LOAD STRENGTH STRENGTH
(days). (scI. in.) (lbs.) (psi) (psi/days)
REC 109 7 11-02-99 4.0 6980 1750 1800/28
REC 110 7 11-02-99 4.0 6790 1700
REC 111 7 11-02-99 4.0 6820 1700
REC 112 28 11-23-99 4.0
REC 113 28 11-23-99 4.0
REC 114 28 11-23-99 4.0
Remarks:
Mike Flute
Technician
SMH/bg
Distribution:
DaI-Mac Construction - Jason Lillard
City of Coppell - Larry Davis
SHW Group - Joe Craddock
Carrollton - Farmers Branch lSD -Tom Bell
FUGRO SOUTH INC.
Reviewed By:
DaI-Mac Construction - Nate Payne
City of Coppell - Lee Stone
SHW Group - Terry Hoyle
FUGRO SOUTH, INC.
ii
CLIENT:
PROJECT:
2880 Virgo Lane; Dallas, Texas 75229
Ph (972) 484-8301; Fax (972) 620-7328
COMPRESSIVE STRENGTH OF MORTAR CUBES
Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: November 4, 1999
Riverchase Elementary School, Coppetl, Texas Project No.: 0791-2184
SAMPLE DATE: October27, 1999
Contractor:
Method of Test:
Sample Location:
Time Batched:
Results / Remarks:
Dal Mac
ASTM C-109
East side of gymnasium 2nd layer
8:55 Time Sampled:
Type S
9:15
SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED
NUMBER TESTED LOAD STRENGTH STRENGTH
(days) (sq. in.) (lbs.) (p_~i) (~_~days)
REC 115 7 11/03/99 4.0 5830 1460 1800/28
REC 116 7 11/03/99 4.0 6180 1550
REC 117 7 11/03/99 4.0 5920 1480
REC 118 28 11/24/99 4.0
REC 119 28 11/24/99 4.0
REC 120 28 11/24/99 4.0
Remarks;
Mortar Temperature 69°
Ambient Temperature 65°
William Granger
Technician
SMH/rm
Distribution:
DaI-Mac Construction - Jason Lillard
City of Coppell - Larry Davis
SHW Group - Joe Craddock
Carrollton - Farmers Branch lSD - Tom Bell
FUGRO SOUTH INC.
Reviewed By:.~~-------~
DaI-Mac Construction - Nate Payne
City of Coppell - Lee Stone
SHW Group - Terry Hoyle