Loading...
SC-CFBISD Riverchase-LR 991029FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: PROJECT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: October 29, 1999 Project No.: 0791-2184 SAMPLE DATE: October 15, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 88 GROUT TEMP. (°F): 82 TIME BATCHED: 11:15 am TIME SAMPLED: 11:30 am WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Dal Mac GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C.231) WATER ADDED: SLUMP (inches) (ASTM C-t43) Gymnasium north side, coarse 25, northeast and northwest ends GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3' x 6", 7.07 square inches CYMNDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 37 7 10/22/99 23670 3348 2500/28 days REC 38 7 10/22/99 23490 3322 REC 39 28 11/12/99 REC 40 28 11/12/99 Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39 Curing: REMARKS: Technician: William Granger FUGRO SOUTH, INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Jason Liilard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: PROJECT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas REPORT DATE: October 29, 1999 PROJECT NO: 0791-2184 SAMPLE DATE: September 24, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Striland Construction 316036 CONCRETE SUPPLIER: 75 PLANT/TRUCK: 76 MIX ID NUMBER: 8:45 AIR (%) (ASTM C-231): 9:45 WATER ADDED (gal): clear SLUMP (in.) (ASTM C-143): Grade beam in area "A" on lines D and G Pioneer 29/1880 9351 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER {days) TESTED (pounds) (psi) (psi) REC 111 7 10-1-99 110000 3890 3000/28 days REC 112 28 10-26-99 126000 4460 REC 113 28 10-26-99 128000 4530 REC 114 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143. Types of Cudng: Mefl'mds: ASTM C-39 Fracture: A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ DaI-Mac Construction - Jason Lillard DaloMac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 28, 1999 CONTRACTOR: JRJ Paving TICKET NO.: 1423058 AMBIENT TEMP. (°F): 73 CONCRETE TEMP. (°F) (ASTM C.1064): 76 TIME BATCHED: 7:15 TIME SAMPLED: 7:57 WEATHER CONDITION: Overcast LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/458 MIX ID NUMBER: 8273 AIR (%) (ASTM C-231): WATER ADDED (gal): 20 SLUMP (in.) (ASTM C-143): 5 3/4 Pavement on grade, parking lot near bus drop thoroughfare area, sampled at middle median in thoroughfare CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER, , Ida}rs) TESTED (pounds) (psi) (psi) REC 124 3 10/01/99 89000 3150 3500/28 days REC 125 7 10/05/99 116000 4100 REC 126 28 10/26/99 152000 5380 REC 127 28 10/26199 150000 5310 REC 128 Hold Fracture mode is (A) unless oflherWise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~ r-['~ r~ r- Cudng: Methods: ASTM C-39 Fracture: AVXI [/XJ VI L.JB C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: · DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farrners Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 28, 1999 CONTRACTOR: JRJ Paving TICKET NO.: 1423326 AMBIENT TEMP. (°F): 79 CONCRETE TEMP. (°F) (ASTM C-1064): 83 TIM E BATCHED: 9:18 TIME SAMPLED: 10:15 WEATHER CONDITION: Cloudy LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/472 MIX ID NUMBER: 5.50 SK AIR (%) (ASTM C-231): 4.7 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C.143): 5 Pavement on cul-de-sac, 20 feet east of west end, 10 feet south of north end CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square Inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYENDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 129 3 10/01/99 67000 2370 3500~28 days REC 130 7 10/05/99 102000 3610 REC 131 28 10/26/99 136000 4810 REC 132 28 10/26199 138000 4880 REC 133 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~:1 r~ r--~ ['- Cudng: Methods: ASTM C-39 Fracture: A1(..3 VXI vi L..JB C D REMARKS: Technician: SMH/rm Distribution: Frank Daniel FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppetl - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o Dai-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: October 29, 1999 Project No.: 0791-2184 SAMPLE DATE: September 30, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: C&D ASTM C-109 First and second lift from bottom on the west wall of gymnasium 8:03 Time Sampled: 8:06 Type S SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) , (psi/days), REC 1 7 10/07/99 4.0 13530 3380 1800/28 REC 2 7 10/07/99 4.0 13610 3400 REC 3 7 10/07/99 4.0 13420 3350 REC 4 28 10/28/99 4.0 19550 4890 REC 5 28 10/28/99 4.0 19210 4800 REC 6 28 10/28/99 4.0 19430 4860 Remarks: Frank Daniel Technician SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas Project NO.: 0791-2184 SAMPLE DATE: September 30, 1999 CONTRACTOR: CMD TICKET NO.: AMBIENT TEMP. (°F): 69 GROUT TEMP. (°F): 60 TIME BATCHED: 10:30 TIME SAMPLED: 10:35 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C-143) On Site 0 North wall on gymnasium on grid line 11.0 7 layers and down GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYUNDER AGE DATE TOTAL LOAD COMPRESSIVE REQUIRED coMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 5 7 10/07/99 31950 4520 2500/28 days . REC 6 28 10~28~99 45010 6370 REC 7 28 10/28/99 44890 6350 REC 8 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143, ASTM C-39 Cudng: REMARKS: Technician: Frank Daniel FUGRO SOUTH, INC. SMH/rm Distribution: Reviewed By: ~~ DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 30, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C.1064): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Striland Construction 316242 CONCRETE SUPPLIER: Pioneer 71 PLANT/TRUCK: 29/1806 75 MIX ID NUMBER: 9351 11:40 AIR (%) (ASTM C.231): 4.5 12:30 WATER ADDED (gal): 20 Sunny SLUMP (in.) (ASTM C.143): 3.50 Grade beams in Area C on grid lines 15 and H.3 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (da)ts) TESTED (pounds) (psi) (psi) REC 149 7 10107/99 116000 4100 3000/28 days REC 150 28 10/28/99 139000 4920 REC 151 28 10/28/99 137000 4850 REC 152 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C'143, Types°f ~] [~ [~1 E] Curing: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH IN~ SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. PROJECT: Riverchase Elementary School, Coppell, Texas Report Date: October 29, 1999 Project No.: 0791-2184 SAMPLE DATE: October 20, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): 68 GROUT TEMP. (°F): 69 TIME BATCHED: 10:40 TIME SAMPLED: 10:50 WEATHER CONDITION: Clear LOCATION OF PLACEMENT: Dal Mac GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C-143) Coarse 55, 20 blocks right of northwest corner On Site GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYMNDER AGE DATE TOTAL LOAD ' COMPRESSIVE REQUIRED COMPREssIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 49 7 9/27/99 24850 3515 2500/28 days REC 50 28 10/18/99 REC 51 28 10/18/99 REC 52 Hold Specifications: Making & ASTM C-31 Testing Methods: ASTM C.143, ASTM C-39 Cudng: REMARKS: Technician: Greg Forsythe SMH/rm Distribution: FUGRO SOUTH, INC. Reviewed By:~ DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: October 29, 1999 Project No.: 0791-2184 SAMPLE DATE: October 20, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Dal Mac ASTM C-109 Gymnasium Coarse 55 5 blocks right of northeast corner 10:00 Time Sampled: 10:10 Type S SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) tpsildays) , REC 85 7 09/27/99 4.0 8820 2205 1800/28 REC 86 7 09/27/99 4.0 8610 2153 REC 87 7 09/27/99 4.0 8480 2120 REC 88 28 10/18/99 4.0 REC 89 28 10/18/99 4.0 REC 90 28 10/18/99 4.0 Remarks: Greg Forsythe Technician FUGRO SOUTH INC. SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell Reviewed DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CYLINDERS CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas Project No.: 0791-2184 SAMPLE DATE: October 19, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): GROUT TEMP. (°F): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Dal Mac 74 72 10:20 am 10:30 am Partly cloudy GROUT SUPPLIER: PLANT/TRUCK: MIX ID NUMBER: AIR (%) (ASTM C-231) WATER ADDED: SLUMP (inches) (ASTM C.143) North side of gymnasium 30 up all across GROUT CYLINDER COMPRESSIVE STRENGTH TESTS Standard 3" x 6", 7.07 square inches CYUNDER AGE DATE TOTAL LOAD COMPRESSIVE REQU'IRED COMPRESSIVE NUMBER (days) TESTED (pounds) STRENGTH STRENGTH (psi) (psi) REC 45 7 10/26/99 17090 2417 2500~28 days REC 46 7 10/22/99 17910 2533 REC 47 28 11/16/99 REC 48 28 11/16/99 Specifications: Making & ASTM C-31 Testing Methods: ASTM C-143. ASTM C-39 Curing: REMARKS: Technician: William Granger FUGRO SOUTH, INC. Reviewed By ',,'~"~'~ - SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: October 29, 1999 Riverchase Elementary School, Coppell, Texas Project NO.: 0791-2184 SAMPLE DATE: October 19, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: Dal Mac ASTM C- 109 North side of gymnasium 30 up all across 11:20 am Time Sampled: Type S 11:30 am SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq-in.) (lbs.) (psi) (psi/days) REC 79 7 10126199 4.0 8750 2188 1800/28 REC 80 7 10/26/99 4.0 8600 2150 REC 81 7 10/26/99 4.0 8570 2143 REC 82 28 11f16/99 4.0 REC 83 28 11116/99 4.0 REC 84 28 11/16199 4.0 , Remarks: William Granger Technician SMH/rm Distribution: DaI-Mac Construction - Jason Liliard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 24, 1999 CONTRACTOR: JRJ Paving TICKET NO.: 1420678 AMBIENT TEMP. (°F): 69 CONCRETE TEMP. (°F) (ASTM C.10~4): 76 TIME BATCHED: 6:02 TIME SAMPLED: 6:50 WEATHER CONDITION: clear LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TX! PLANT/TRUCK: 41/804 MIX ID NUMBER: 5.5 AIR (%) (ASTM C-231): 3.6 WATER ADDED (gal): 10 SLUMP (in.) (ASTM C-143): 3 Pavement on Starlift at station 1 +50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 101 3 9-27-99 121000 4280 3500/28 days REC 102 7 10-1-99 144000 5090 REC 103 28 10-26-99 181000 6400 REC 104 28 10-26-99 183000 6470 REC 105 Hold Fracture mode is (A) unless otherwise no~ Specifica,ons: Making & ASTM C-31 Tes,ng ASTM C-143, Typesof r~ F~ [~ F"~ Curing: Methods: ASTM C-39 Fracture: Av~ Y_..51 Y_.l L--lB C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate/Payne City of Coppell - Larry Davis ~ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 29, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September24, 1999 CONTRACTOR: JRJ Paving TICKET NO.: 1421029 AMBIENT TEMP. (°F): 70 CONCRETE TEMP. (°F) (ASTM C.1064).' 78 TIME BATCHED: 8:51 TIME SAMPLED: 9:30 WEATHER CONDITION: sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 41/837 MIX ID NUMBER: 5.5 AIR (%) (ASTM C-23'1): 3 WATER ADDED (gal): SLUMP (in.) (ASTM C-143): 3.5 Pavement on Starlift at station 4+50 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 106 3 9-27-99 130000 4600 3500/28 days REC 107 7 10-1-99 137000 4850 REC 108 28 10-26-99 190000 6720 REC 109 28 10-26-99 188000 6650 REC 110 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof [~ [~ 0 F-] Cudng: Methods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Frank Daniel FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By:~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 CLIENT: PROJECT: REPORT NO: Owner: Architect: Engineer: Contractor: Fabricator: Ph (972) 484-8301; Fax (972) 620-7328 STRUCTURAL STEEL INSPECTION REPORT -- Carrollton - Farmers Branch lSD c/o DaI-Mac Construction DATE: October 29, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 PAGE 1 Carrollton - Farmers Branch SHW Group, Inc. SHW Group, Inc. DaI-Mac Construction Location of Project: Coppell, Texas Performed At: Job Site X Fabrication Shop DESCRIPTION OF INSPECTION: Structural Steel Inspection } Visual Inspec~on of Welds on ]~[~I]~J~L~~) or Ultrasonic Te~ting or Magnetic Particle Inspection of Weld~ and Inspection of Bolted Connections for compliance to Project specifications, Contract Documents, Drawings, and Govemlng Codes } AWS, AISC, ASTM, SJI, ASNT, ANSI. of Inspection: See attac~eports for Specific Areas Inspected or Tested. Results of Inspection: Erection Is: Project Complete Project Incomplete X are being conic, ted at time of Inspection, are not being listed on Report. In Compliance ---------- X 4on Compliance _._NOTE: Inspection was performed to verify compliance to Project s cations, Contract D ents Drawings a Codes} AWS, AISC, ASTM, SJL, ASNT, ANSI Inspected By: Distribution: Doug Post, AWS/Certified Welding Inspector, ASNT/Cerfified Level 2 (UT, MT) DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell STR-1 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: ~.~.~'~,..J- -/'~.~,,,,,,~ ~ ~.,Jg-~. I,'~ DATE: lo.h=./"~'~ PROJECT: ~/~F...~.,CP,~E_ '~/~.,.~'~.~/"~e~: PROJECi N0: .0'~'? ~- ? ]~ REPORT NO: J PAGE ,P*-. OF ..~ In I Non Type of Inspection Location Compliance Compliance Check Bolt Tightening Procedure Check Connection for Required Size of Bolts Check Connection for Required No. of Bolts ~, .V/'' Check Bolt Tightness with Torque Wrench Visual Inspection of Tension Control Bolts Beadng Bolted Connections I Snug Tight Check Bolted Connection / Turn of Nut Check Gap on Loaded Indicator Washers Check Size, Length, and No. of Shear Studs Check Gauge of Composite Deck Check Gauge of Roof Deck Check Size Lap Connection on Composite Deck Check Size Lap on Roof Deck Check Installation of Bridging on Joists / Girders Check Installation of Expansion Anchors Check Grout Report hand wdtten at time of inspection by Field Inspector Report will be submitted as is and not typed ~' in box = In compliance X in box = Non compliance } See Non compliance repor~ Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) STR-3 FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 I=h (972) 484-8301; Fax (972) 620-7328 FIELD ERECTION - MEMBERS INSPECTED or TESTED CLIENT: ~ ...' .."T" jC~'~ ~,~ ~ :T~-- - ~':~ .'.~ ~'~ DATE: , PROJECT: -~.,,/~_.:~.~C.~z~,. .- ~. ~t~.,.. ~ ~ ~ ~,..~ PROJECT ~O: ~/- REPORT NO: I ~ PAGE 5 OF Type of Inspection Location I ' Non Compliance, Compliance Check Anchor Bott Group Check Nuts on Anchor Bolts / Tight Check Erection Procedures Check for Damaged Members Check Welders Qualification Records ~k~T.- ~ ~1~ ~-~ ~ ~,~ i F.. Check Fit-Up of Welded Connections Visual Quality of Welds on Structural Steel Visual Quality of Welds on Joists / Girders Visual Quality of Welds on Misc Steel Visual Quality of Welds on Pre Cast Connection Visual Quality of Welds on Composite Deck Visual Quality of Welds on Roof Deck Visual Quality of Welds on Shear Studs Check Size of Welds on Structural Steel Check SiZe of Welds on Joists / Girders Check Size of Welds on Misc Steel Check Size of Welds on Pre Cast Connection Check Size of Welds on Composite / Roof Deck Check Size of Welds on Shear Studs Ultrasonic Testing of Welds Mag Particle Testing of Welds Report hand written at time of inspection by Field Inspector Report will be submitted as is and not typed ~' in box = In compliance X in box = Non compliance } See Non compliance report Inspected By: Doug Post, AWS/Certified Welding Inspector, ASNT/Certified Level 2 (UT, MT) STR-2 FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF MORTAR CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: October 29, 1999 Project No.: 0791-2184 SAMPLE DATE: October 18, 1999 Contractor: Method of Test: Sample Location: Time Batched: Results / Remarks: Dal Mac ASTM C-109 Gymnasium south side coarse 3 and 19 blocks from southwest corner 10:40 Time Sampled: 10:45 Type S SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 73 7 10/25/99 4.0 8140 2035 1800128 REC 74 7 10/25/99 4.0 8250 2062 REC 75 7 10/25/99 4.0 8370 2092 REC 76 28 11/15/99 4.0 REC 77 28 11/15/99 4.0 REC 78 28 11/15/99 4.0 Remarks: William Granger Technician SMH/rm Distribution: DaI-Mac Construction - Jason Lillard City of Coppell - Larry Davis SHW Group - Joe Craddock Carrollton - Farmers Branch lSD - Tom Belt FUGRO SOUTH INC. Reviewed By: ~ DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyte