Loading...
SC-CFBISD Riverchase-LR 991011FUGRO SOUTH, INC. 2880 Virgo Lane; O~_!!as~ Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 11, 1999 PROJECT: Riverchase Elementary School, Coppeil, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 10, 1999 CONTRACTOR: TICKET NO.: AMBIENT TEMP. (°F): CONCRETE TEMP. (°F) (ASTM C-t0~4): TIME BATCHED: TIME SAMPLED: WEATHER CONDITION: LOCATION OF PLACEMENT: Striland Construction 345555 CONCRETE SUPPLIER: Pioneer 79 PLANT/TRUCK: 27/653 90 MIX ID NUMBER: 9351 7:25 am AIR (%) (Aswa c-231): 8:30 am WATER ADOED (gal): 0 Clear SLUMP (in.) (ASTM C-t43) .' 5 Building D, grade beams CONCRETE CYLINDER COMPRESSIVE STRENGTH ! 15STS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 17 7 09/17/99 97000 3430 3000/28 days REC 18 28 10/08/99 124000 4390 ... REC 19 28 10/08/99 122000 43~n REC 20 Hold F~ac~re mode is (A) un!e~_~ o~,e,'wise not~, Specifications: Making & ASTM C-31 T"ting ASTM C'143' Types°f [~J [~ [~ E~] Curing: Me .thod___~: ASTM C-39 Fracture: A B C D REMARKS: Technician: SMH/bg Distribution: William Granger FUGRO SOUTH INC. Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301: Fax (972) 620-7328 CLIENT: PROJECT: FIELD DENSITY REPORT Carrollton-Farmers Branch lSD, c/o Dal-Mac Construction REPORT DATE: October 11, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: October 8, 1999 Density Test Method: Number 1 ASTM D-2922 & 3017 MOISTURE/DENSITY RELATIONS Material Description Mix tan clay and dark brown clay Method of Compaction: ASTM D-698 Proctor Results Maximum Dry Density (pcf) Optimum Moisture (%) 112.7 15.1 TEST RESULTS TEST PROCTOR LOCATION UNIT DRY NO. NO. WEIGHT 99 1 Sidewalk that runs east and west along 109.6 Main Road all the way to McArthur Boulevard, 50 feet west from east side, final 100 I Sidewalk that runs east and west along Main Road all the way to McAxl~ur Boulevard, 200 feet west from east side, final Sidewalk that runs east and west along Main Road all the way to McArthur Boulevard, 300 feet west from east side, final Sidewalk that runs east and west along Main Road all the way to Mc, Arthur Boulevard, 50 feet east from west side, final 101 1 102 1 MOISTURE CONTENT PERCENT PERCENT OF MAXIMUM DENSITY 18.7 97.2 112.5 15.9 99.8 108.6 16.4 96.4 109.3 19.1 97.0 Remarks: Densities meet project specifications unless otherwise noted. David Putman Fugro South Technician FUGRO SOUTH INC. SMH/bg Distribution: DaI-Mac Construction - Jason Lillard Dal-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell Reviewed By: FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 820-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: October 11,999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: October 7, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Firelane that runs along south side of school and then tums south and intersects with main entrance road 7:00 a.m. 12:00 p.m. 260 3,75 - 5.0 5.0 TXI - Plant No. 41 73- 85°F 3600/28 12 No David Putman Fugro South Technician FUGRO SOUTH, INC. SMH/ Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell