Loading...
SC-CFBISD Riverchase-LR 991006d FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: October 6, 1999 Riverchase Elementa~ School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: October 5, 1999 General Contractor: Stdland Construction Method of Test: Applicable ACl Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Grade Beam - Line #11 E-K following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 12:15 p.m. 1:05 p.m. 20 5.0 to 5.0 Pioneer - Plant No. 29 84oF 3000/28 1 set of 4 No John Whitehead Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: c , / DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell