Loading...
SC-CFBISD Riverchase-LR 991004FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)'484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF GROUT CUBES Carrollton-Farmers Branch lSD, cio DaI-Mac Const. Riverchase Elementary School, Coppell, Texas Report Date: October 4, 1999 Project No.: 0791-2184 SAMPLE DATE: September 2, 1999 General Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: DaI-Mac Construction / Berkel ASTM C-109 Pile 31 11:50 Type 9000 B Time Sampled: 12:20 SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 108 7 09/09~99 4.0 19740 4940 4000/28 REC 109 7 09/09/99 4.0 19930 4983 REC 110 7 09/09/99 4.0 19800 4950 REC 111 28 09/30/99 4.0 20510 5128 REC 112 28 09/30/99 4.0 20300 5075 REC 113 28 09/30199 4.0 20420 5105 Remarks: Mike Flute Fugro South Technician FUGRO SOUTH INC. SMH/mv Distribution: Reviewed By: ~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis ' City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: October 4,1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: September 29, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Pavement - On the south half of Cul-de-sac (on the northwest side) back to 35 feet south of southwest corner of building 7:00 a.m. 11:30 a.m. 220 4.5 to 5.0 3-5 TXI - Plant No. 41 73 - 76°F 3500 psi/28 10 No Frank Daniel Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard Dai-Mac Construction - Nate Payne City of Coppell - Larry Davis/ City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hcyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farrners Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: October 4, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: September 30, 1999 General Contractor: DaI-Mac Construction Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Pavement on right turn lane from MacArthur into Starleaf and curve on bus lane (northwest side) 8:00 a.m. 11:00 a.m. 110 3.5 to 3.5 3-5 TX! - Plant No. 31 71OF 3500/28 5 No Frank Daniel Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac ConstructionREPORT DATE: October 4, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: September 30, 1999 General Contractor: DaI-Mac Construction Method of Test: Applicable ACl Recommendations and ASTM Standards Results I Remarks: Concrete placement observation was performed at the following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: Grade Beams in Area C and D (Area C) on Lines 14 to 15 from D to H.6 and on Line 14 from Tto V.8 (Area D) on Lines W to Y.5 from 20.5 to 17 11:00 a.m. 1:45 p.m. 45 3.5 3-4 Pioneer - Plant #29 75°F 3000~28 4 No Frank Daniel Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: October 4, 1999 PROJECT: Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 SAMPLE DATE: September 23, 1999 CONTRACTOR: J R J Paving TICKET NO.: 316004 AMBIENT TEMP. (°F): 76 CONCRETE TEMP. (°F) (ASl'~ c.10s4): 81 TIME BATCHED: 10:50 TIME SAMPLED: 12:50 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 29 MIX ID NUMBER: 9351 AIR (%) (ASTM C-231): WATER ADDED (gal): 25 SLUMP (in.) (ASTM C-143): 6 Pier caps, AA.5 - 19 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYUNDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 97 7 9-30-99 104000 3680 3000/28 days REC 98 28 10-21-99 REC 99 28 10-21-99 REC 100 Hold Fracture mode is (A) unless otherwise noted Specifications: Making & ASTM C-31 Testing ASTM C-143, Typesof ~] ~ ~ ~ Curing: Me.ods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mike Flute SMH/mv Distribution: FUGRO SOUTH INC. Reviewed By: ~'~/ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas. Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 COMPRESSIVE STRENGTH OF CONCRETE REPORT CLIENT: Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. PROJECT: Riverchase Elementary School, Coppell, Texas REPORT DATE: October 4, 1999 PROJECT NO: 0791-2184 SAMPLE DATE: September 23, 1999 CONTRACTOR: J R J Paving TICKET NO.: 1419854 AMBIENT TEMP. (°F): 76 CONCRETE TEMP. (°F) (AS?M C-t0~4): 81 TIME BATCHED: 9:18 TIME SAMPLED: 10:12 WEATHER CONDITION: Sunny LOCATION OF PLACEMENT: CONCRETE SUPPLIER: TXI PLANT/TRUCK: 31 MIX ID NUMBER: 8273 AIR (%) (ASTM C-231): 4 WATER ADDED (gal): 0 SLUMP (in.) (ASTM C-143): 5 1/4 Entrance way, Star Leaf at McArthur, 8 feet off McArthur, station 0+05 CONCRETE CYLINDER COMPRESSIVE STRENGTH TESTS Standard 6" x 12", 28.27 square inches TOTAL COMPRESSIVE SPECIFIED COMPRESSIVE CYLINDER AGE DATE LOAD STRENGTH STRENGTH NUMBER (days) TESTED (pounds) (psi) (psi) REC 93 7 9-30-99 113000 4000 3500/28 days REC 94 28 10-21-99 REC 95 28 10-21-99 REC 96 Hold Fracture mode is (A) unless otherwise noted Specificati°ns: Making & ASTM C'31 Testing ASTM C-143. Typesof ~ ~] ~ C Cudng: Mefl~ods: ASTM C-39 Fracture: A B C D REMARKS: Technician: Mike Flute FUGRO SOUTH INC. SMH/mv Distribution: Reviewed B .W'"~./.----~- ~ DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell