Loading...
SC-CFBISD Riverchase-LR 990914FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: GENERAL REPORT Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: September 14, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DAILY ACTIVITY REPORT: August 17, 1999 Services Performed: Weather Conditions: Contractors on Site: Visual Inspection Sunny / Hot Dalmac / Berkel Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: · Started at 1:00 p.m. · Production: 3 Auger cast piles, sonic logging to be completed next day. · Total Piles to date: 3 Nabil Mikhail Fugro South Project Engineer SMH/bg Distribution: FUGRO SOUTH, INC. David A. Belcher, P.E. Sr. Project Manager DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell "FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF GROUT CUBES Carrollton-Farmers Branch lSD, cio DaI-Mac Const. Report Date: September 14, 1999 Riverchase Elementary School, Coppell, Texas Project No.: 0791-2184 SAMPLE DATE: August 17, 1999 General Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: DaI-Mac Construction / Berkel ASTM C-109 Pile B-51 1:28 p.m. Type 9000-B Time Sampled: 3:35 p.m. SAMPLE AGE 'DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 9 3 8-20-99 4.0 17650 4413 4000128 REC 10 3 8-20-99 4.0 17430 4358 REC 11 7 8-24-99 4.0 21134 5285 REC 12 7 8-24-99 4.0 21154 5289 REC 13 28 9-14-99 4.0 23750 5938 REC 14 28 9-14-99 4.0 23680 5920 REC 15 Hold 4.0 REC 16 Hold 4.0 REC 17 Hold 4.0 Remarks: Michael Overstreet Fugro South Technician FUGRO SOUTH INC. SMH/rm Distribution: Reviewed By: ~ -- II DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis / City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell -- IGLOO FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972)484-8301; Fax (972) 620-7328 CLIENT: PROJECT: GENERAL REPORT Carroilton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: September 14, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DAILY ACTIVITY REPORT: September 7, 1999 Services Performed: visual Inspection Weather Conditions: Sunny/Hot Contractors on Site: DaI-Mac I Berkel Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: · Production: 16 piles · Total number of piles to date: 155 piles · Two sets of grout cubes from Pile C-92A · Sonic PVC: C-86, C-92a, A-47, C-87 · No major problems Nabil Mikhail Fugro South Project Engineer FUGRO SOUTH, INC. David A. Belcher, P.E. Senior Project Manager SMH/bg Distribution: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. CLIENT: PROJECT: 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 GENERAL REPORT Carroilton-Farmers Branch lSD, c/o DaI-Mac COnst. REPORT DATE: September 14, 1999 Riverchase Elementary School, Coppeli, Texas PROJECT NO: 0791-2184 DAILY ACTIVITY REPORT: September 8, 1999 Services Performed: Weather Conditions: Contractom on Site: visual Inspection Cloudy Dalmac / Berkel Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: * Production: 23 piles * Total number of piles to date: 178 piles * Two sets of cubes from Piles D174, D175, D176 were cast * Two piles were added next to A46 (A46a, 4 feet to the east and A46b, 4 feet to the west) * A-46 a drilled to 65 feet * A-46 b drilled to 65 feet * Sonic PVC: C-93, C-94 * Tim Roberts doing the Sonic Tests. Note: Todays drilling completes the Auger ClP piles. Nabil Mikhail Fugro South Engineer SMH/bg Distribution: FUGRO SOUTH INC. David A. Belcher, P.E. Sr. Project Manager Dal-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: OBSERVATION OF CONCRETE PLACEMENT Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: September 14, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DATE PERFORMED: September 10, 1999 General Contractor: DaI-Mac Method of Test: Applicable ACI Recommendations and ASTM Standards Results / Remarks: Concrete placement observation was performed at the Building D and Building B Grade Beams following location: Time placement began: Time placement ended: Total cubic yards placed: Slump range (inches): Slump required (inches): Concrete supplier and plant: Concrete temperature range (°F): Strength required (psi/days): Number of cylinders made: Superplasticizer used: 8:30 a,m. 10:55 p.m. 40 4.5 to 5 5 Pioneer / Plant No. 27 85 - 90°F 3000/28 4 No William Granger Fugro South Technician FUGRO SOUTH, INC. SMH/bg Distribution: Reviewed By: DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group o Joe Craddock SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell