SC-CFBISD Riverchase-LR 990827FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: COMPRESSIVE STRENGTH OF GROUT CUBES Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. Report Date: August 27, 1999 Riverchase Elementary School, Coppell, Texas Project NO.: 0791-2184 SAMPI F_ DATE: August 23, 1999 . General Contractor: Method of Test: Sample Location: Time Batched: Results I Remarks: DaI-Mac Construction / Berkel ASTM C-109 Pile D111 11:15 am Type 9000B Time Sampled: 12:05 pm SAMPLE AGE DATE AREA APPLIED COMPRESSIVE REQUIRED NUMBER TESTED LOAD STRENGTH STRENGTH (days) (sq. in.) (lbs.) (psi) (psi/days) REC 36 3 08/26/99 4.0 18190 4548 4000/28 REC 37 3 08126/99 4.0 18125 4531 REC 38 7 08130/99 4.0 REC 39 7 08~30~99 4.0 REC 40 28 09~20~99 4.0 REC 41 28 09120/99 4.0 REC 42 Hold 4.0 REC 43 Hold 4.0 REC 44 Hold 4.0 Remarks: Mark Strittmatter Fugro South Technician SMH/rm Distribution: DaI-Mac Construction - Jason/Lillard City of Coppell - Larry Davis -- SHW Group - Joe Craddock JRJ Paving - Jeff Williford FUGRO SOUTH INC. Reviewed By: ~ -- DaI-Mac Construction - Nate Payne City of Coppell - Lee Stone SHW Group - Terry Hoyle Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane; Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: GENERAL REPORT Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: August 27, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DAILY ACTIVITY REPORT: August 25, 1999 Services Performed: Weather Conditions: Contractors on Site: Visual Inspection Sunny / Hot Dalmac / Berkel Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: · Production - 13 piles at 85 feet · Pump calibrated first thin~ in the morning C.F.: 0.92 · No major problem encountered today · 1 set of cubes (9 cubes) from C105 and C97 Total number of piles to date: 60 piles Fugro South Project Engineer SMH/bg Distribution: FUGRO SOUTH, INC. David A. Belcher, P.E. Sr. Project Manager DaI-Mac Construction - Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyte JRJ Paving - Jeff Williford Carrollton - Farmers Branch lSD - Tom Bell FUGRO SOUTH, INC. 2880 Virgo Lane: Dallas, Texas 75229 Ph (972) 484-8301; Fax (972) 620-7328 CLIENT: PROJECT: GENERAL REPORT Carrollton-Farmers Branch lSD, c/o DaI-Mac Const. REPORT DATE: August 27, 1999 Riverchase Elementary School, Coppell, Texas PROJECT NO: 0791-2184 DAILY ACTIVITY REPORT: August 24, 1999 Services Performed: visual Inspection Weather Conditions: Sunny/Hot Contractors on Site: Dalmac / Berkel Remarks: On this date, a representative of Fugro South, Inc. was present on the above mentioned project to perform the following tests and observations as requested: * Production - 11 piles 1 set of grout cubes (9 cubes) from D138 and D139 Last Pile D142: First, one truck (#525) was rejected as it was waiting more than 2 hours and grout temperature was about 108 degrees. We used the second truck (#470) and the hole was filled with 9 yards; however, the number of strokes was over 420 (13.7 yards), which, in our opinion, the calibration factor was changed due to hard grout. We re-inserted the augers to 32 feet and re-grout to have overall about 12 yards pumped with grout factor of 1.21 and a grout return of 10 feet. Fugro South Project Engineer FUGRO SOUTH, INC. David A. Belcher, P.E. Sr. Project Manager SMH/bg Distribution: DaI-Mac Construction -Jason Lillard DaI-Mac Construction - Nate Payne City of Coppell - Larry Davis City of Coppell - Lee Stone SHW Group - Joe Craddock SHW Group - Terry Hoyle JRJ Paving - Jeff Williford Carrollton - Farmers Branch lSD - Tom Bell 2880 Virgo Lane Dallas, Texas 75229 P..~e: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. I~ ~5 PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~. ?.'/-%~ CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: ~,,,.~ // H,,J: Grout 'rlck~ Batch Arrival Load Water Added Grout Sampling/Testing Grout Cube Data Truck No. No. Time Time (YEP) On-Site (Gal) MIX NO,: 90(X ~ , 4000psi Time Temp. Flowco~e T.~e Made Set * Add 1 sack of Fluidifler On-Site DWG NO. G~tir~ Summery R.~o~,e Sum~ PILE NO. In~l R~ De~ ~mp G~ut Pump In~l~ ~ (FL~ S~ Fair Pros. (FL~, S~ Fa~ R~h: ~: ~ 72~7 O~ (FL) ~ e7~2 T~ S~ ~ ~2.7 7-2 ~ ~ ~c . / C~ O~ 4 ~ be~ ~Ft Gram Loss D~aing Adj~nt Pile Rema~s: P~ ~un~ ~S~: 0 Pi~ T~ Clean~ Yes S~ Pl~t P~ems?: Vol. ( 24 in. dia.1= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 2~1}O V%rgo Lane F, .~e: (972) 48A-~301 Dallas, Texas 75229 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Can'ollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: CONTRACTOR: DalmacJBerkel & Co. Contractors Weather: _..c~n._ Grout Ticket Batch Arrival Load Water Added Grout Sampling/Teeing Grout Cube Data Track No. No. Time Time (Yd~) On-Site (Gal) MIX NO.: 900~ B 4000~i Time Temp. Flowcone Tu~e Made Set Sampled De~ees Sec. NO. * Add 1 sack of Fluidifier On-Site DWG NO. C~uU.; Summary Re-Gro~ Summary PILE NO. In~ Re- D~ ~m~ ~ Pump O~ffi Pump G~t In~a~ ~t ~Ft.) S~ F~ P~. (FL~ S~s Fa~r Pi~ ~p B~.(FL) 8 ~ 62~7 ~ S~ ~ 'O~ 52=7 A~. ~ P~. <~ 42~7 G~ ~ (~ I0 37~2 ~p~ 7-2 ~ O~ 4 ~ ~ ~t ~lize~ ~ Loss Ddl~ng ~t Pi~ Re~s: Pump Coun~r ~S~: 0 =sto : I Pi~ Top Cl~n~?: Yes S~ Plaint Vol. ( 2_4_j~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 i~a~m _~auth, Inc. 2880 Virgo Lane Dallas, Texas 75229 P, .~e: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. .CE ~ PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~-2.'~ -~ CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: _~,~n..~ // [-I,,~- Grout Ticket Batch Arrival Load Water Added Grout Sampling/Teating Grout Cube Data Truck No. No. Time Time (Yd3) On-Site (Gal) MIX NO.: 9000B 4000~ T~ne Temp. Flowcone Time Made Set Add I sack of Fluidifler On-Site DWG NO. Grou0n~l Summer~ Re-Groutin~l Summaq/ PILE NO. ,na~ Re- Depth Pump Grout Pump Depth Pump Grout Installation Grout (FL) Strokes Factor Pres. (Ft) Strokes Factor ~t Yes 85-82 Auger Dia. {In.) 24 82-77 Augering Start: i~ '~ ,'~.' 77-72 ~.~,: 8: .')~ 7~.. t8 ~ Tip Elev.iFL} ~ ~ 8257 Grouting Start: ~ ;5'6 52-47 Finish: C~ .G~.. 47-42 Av~ Pump Phis. (pall 42-37 Grout Return (Ft) ~q 37-32 ou~ww~..w.,:. ~5~. ~-= over.,, Grou, ~.c,o, I. ~- ~ ,7.,, Sonic Logging PVC / C, age Oeschption 4 #7 be~ 30Ft Centralizers Grout Loss Drilling Ad, cent Pile Rereads: Pump Counter @Start: 0 Pile Top Cleaned?: Yes Steel Placement Problems?: Vol. ( 24 in. dia.}= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 .l~ugro ~outh, Inc. 2880 Virgo Lane Dallas, Texas 75229 F. ,~e: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. R --//+ PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~-~'t -35 CONTRACTOR: Dalmac/Berkel & Co, Contractors Weather: ~ ~.-nn_~ ,/ ~.tc Grout Ticket Batch Arrival load Water Added Grout Ssmlding/Tesflng Grout Cube Data Track No. No. Time Time (Yd~) On-Sits (Gal) MIX NO.: gOiX B 4ooop~i Time Temp. Flowcone Time Made Set .~- * Add 1 sack of Fiuidifler )n-Site DWG NO. Gsaw Summar~ Re-Grouttn; Summary PILE NO. initial Re- Depth Pump Grout Pump Depth Pump Grout ~nsta~atlon Grout (F~) Strokes Factor Pres. {F~). Strokes Factor ~ E~v. ~) (~ 3 9l,_ initial ~ N/A initial N/A Auger Dia. (In.) 24 02.77 Augedng Star~ ..~; ti3 77-72 ~ <Ft.) 85 67-~2 Gro~.~ sta~. ~}' ~.~ II0: )t 52-47 Finish: [0: I3 47-42 AV~ Pump Pres. <psi) 42-37 Gn:xJt Retum <Ft) t~ 37-32 '~ Ov.,G~F~=, I,;~ ~7-~2 ~')/'~_~1 ..... 'J Tenalon Staal Pl~ced 12-7 Dasc~ptk)n 7-2 Centralizers 2-Ground 8 / ~" , ~ oes=~ 4 #? t~rs~ ~oFt Grout LOSS Drilling Adjacent Pile Reman'<s: Pump Counter @Start: Pump cou.ta, os~op: /+ ~ ~' Pile Top Cleaned?: Yes Steel Placement Problems?: Vol. ( Z_4.jD~d.~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 l;ugro ~outh, Inc. 2880 Virgo Lane Dallas, Texas 75229 Pi ,e: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. G -°~ ~.. PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carroilton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: c_,,~ Grout Ticket Batch Arrival Load Wete~ Added Grout Semi,lng/Testing Grout Cube Data Truck No. No. T~ne Time (Yd~) O~-Site (Gal) MIX NO.: 900( a 4000~i Time Teml~. Flowcon~ Time Made Set Sampled Degmeli ~ No. * Add I sack of Fluidifier On-Site DWG NO. G~,w sum.~7 ee,c~o~ng Sum.~, PILE NO. ~nWe~ Re, Depth Pump ~t P~ ~p~ Pump In~l~ ~t (FL) S~ F~ PMI. {~) S~es F~r Au~r Dia. <In.) 24 82-. ~ I ~ s~ / ~ t ( ~-. ~ 5 A~. PU~ P~. ~ 42~7 ~ ~ T~I S~ Ini~l: ~ ~ 32-27 ~3 T~I ~t V~: (F~ ~ ~ ~ ~G ~-17 ~ ~ ~ L~ ~C ~ ~ 0 ~ ~p~ 4 ~7 ~ ~F~ Adjel Pile R~a~s: Pump ~unter ~S~: 0 Pump ~unter ~Stop: ~ ~ Pile Top Cl~n~?: Yes St~ P~t P~I~s?: Vol. (24 in. dia.}= 3.14 F~/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 "Fugro South, Inc. 2880 Virgo Lane Dallas, Texas 75229 Phune: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~ _['~-9 CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: 5:,~.~3 ! H~ Grout Ticket Batch An'ival Load Water Added Grout Sampling/Testing ~ Cube Data Track No. No. Tm~e Time (Yd3) On-Site (Gal) MIX NO.: Time Temp. Ftowcx~ Time Made Set * Add 1 sack of Fluidifier On-Site DWG NO. GroutS; summ.r~ r~o~w summus/ PILE NO, In,al R~ ~ ~ ~ ~ Oep~ Pump Grout ~t v. ~2 15 ' A~. Pump P~. (~) 42~7 T~ S~kes Initial:~O 32.27 T~ St~ P~ 12-7 ~;~:~ 7-2 ~ 0 C~ ~ 4 ~ be~ ~jaMnt Pile P~ C~ter ~S~: 0 Pump Counter ~Stop: ~ ~ 0 Pi~ T~ C~?: Yes S~ ~nt ~?: Vol. ( Z..4._j[!,_.djQ~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 t;ugro ~outh, Inc. 2880 Virgo Lane Dallas, Texas 75229 F .~e: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PILE NO. ~ r PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~ ?,1 CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: ._~,~ n ~ / Gn3ut Ticket Batch An~val Load Water Added Grout Sampling/TesUng Grout Cube Oata Truck No. No. Time Time (Yd3) On-Site (Gal) MIX NO.: 9(X3¢ ~} 4ooopsi S=W~,d OW~.. sec. No. Add I sack of Fluidifier On-Site DWG NO. ,, Gm, u,w Sur~' Re-C,,o~,a~ S.,m~ry PILE NO, m~a~ Re- De~ Pump Grout Pump ~pth Pump ~ut I~n ~ , (FL) S~ F~ Pros. (Ft.~ S~es F~ /O: [5 -72 Aw, Pump P~. (~} 42~7 Total S~ In~l:~ 32-~ T~ S~ ~ 12-7 ~ 7-2 ~ Oe~p~ 4 ~ ba~ Grout Lo~ O~ll~ ~nt R~s: Pump Coun~r ~S~: 0 Pump C~nt~ =Stop: ~ ~ ~ Pi~ T~ CI~?: Yes S~ Pl~t P~s?: Vol. ( Z_4_~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 ,Fu§~.e Ceu~k, I~e. 2880 Virgo Lane Dallas, Texas 75229 F..le: (972) 484-8301 Fax: (972) 620-7328 AUGERED CAST4N-PLACE PILE RECORD PILE NO. PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carrollton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Date Installed: ~-~_'( -5~ CONTRACTOR: Dalmac/Berkel & Co. Contractors Weather: ~u~,~. / ~o~- Grout Tick~ Batch Arrival Load Water Added G'out SampltngrrestJng ~ Cube Data Truck No. No. Tim ~ (Yd~) On-Site (Gal) MIX NO.: 900( ] Tkne Temp. Fiowcone Ta,ne Made Se{ * Add I sack of Fluidifler On-Site DWG NO. ~utiw sun.,~ry Re-C-,,'outir~ Summ~/ PILE NO, Initial R~ Dep~ Pump ~t Pu~ Dep~ Pump Grout Inflation ~t {FL~ $~ F~r P~. {FL) S~ Fa~ ~t R~ (Ft) ~ ~ 37~ ~ L ,,, G~ Lo~ Ddlling ~ja~nt Pile Pump Counter ~S~: 0 Pi~ T~ Clean~?: Yes S~I Pla~ment P~lems?: Vol. ( Z_~_jD.~UA~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval = 20 ugre oulh In , Z~OO ¥irgo Lane Dallas, Texas 75229 Ph~'~ ;; (~)??)404--~301 Fax: (972) 620-7328 AUGERED CAST-IN-PLACE PILE RECORD PROJECT: Riverchase Elementary School Project No.: 0791-2184 OWNER: Carroilton-Farmers Branch I.S.D. Observed By: N. Mikhail ENGINEER: SHW Group, Inc. Data Installed: [ - Z.'I -~ CONTRACTOR: Daimac/Berkel & Co. Contractors Weather: Grout Tlc~t Batctt Ardvat Load Water ~ ~t S~~ ~t ~ Dam T~ ~. ~. ~ ~ ~) ~i~ (~1) M~ NO.: ~ a ~ ~ T~. ~ ~ M~ S~ ~ ~ ~ NO. Add Fluidifler On Site DWG NO. G,ouUw Summ=7 ...c, muuw Su.m~,7 PILE NO. Ini~al R~ Dep~ ~mp Pump O~ Pump G~t I~l~n ~t {FL) S~k~ F~ P~. (FL) S~e~ ~--~, ~ Dia. (In.) 24 ~ge D~p~n 4 ~7 Cen~lizem Grout Loss Ddlling Adja~nt Pile Rema~s: Pump Counter ~Sta~: Pile Top Clean~?: SI~ Plant Problems?: Vol. ( 42~jD,=.dj.a~= 3.14 FT3/Foot, Pump Calib. Factor = 0.92 FT3/Stroke, Min. Stroke/5 FT interval