Loading...
Riverview Estates-CS 971124TRANSMITTAL CCM ENGINEERING CORP. I I ~0 EMPIRE CENTRAL PLACE, SUITE ,3,08 DALLAS, 'TEXAS 75:~47 E I 4-630-5 ~'00 FAx: ~' I 4-905-9393 To.' Ken Griffin, P.E. City of Coppell Date: November 24, 1997 Ref:Fr°m: ~T°mmy N. Cansler ~ ~ Ken, Enclosed are the following items as requested by Larry Davis per his letter dated November 14, 1997 regarding items that needed to be completed prior to final acceptance. Lot elevation certification Paving certification As-Builts (delivered earlier with revisions per Larry Davis' comments) Certified print of the south property line showing the grades of the swale and inlets. Also included is a cost break down of the connection of Glade Drive from Longmeadow Drive to the west property line of this site. Sincerely, CCM Engineerin. -,orporation 1120 EMPIRE CENTRAL PLACE · SUITE'#308 DALLAS, TEXAS 75247 (214) 630-5200 · FAX (214) 905-9393 City of Coppell Attn: Larry Davis 255 Parkway Blvd. Coppell, TX 75019 November 17, 1997 Ref: Riverview Estates To Whom it concerns, I, JeffD. Crannell,P.E., do hereby certify ,that to the best of my knowledge, the street paving and the lot elevations for Riverview Estates, Coppell, TX were completed and were built in accordance with the approved "As-Built" Construction Plans. CCM ENGINEERING CORP. RIVERVIEW ESTATES 11/24/97 COPPELL, TEXAS Connection of Glade Drive From Longmeadow to West Property Line. ITEM QUANTITY UNIT BID AMOUNT COST STORM SEWER 18" R.C.P. 45 L.F. $14.52 $653.40 10' INLET 2 EA. $2,050.00 $4,100.00 REMOVE EXISTING "Y" INLET 1 L.S. $500.00 $500.00 SUB-TOTAL STORM SEWER $5,253.40 PAVING & EXCAVATION SITE EXCAVATION --~o 380 C.Y. Ir~..~~ $1.50 5~' ~$570.00 4~.~-'° 6"'3600 P.S.I. PVMT W/ INT. CURB 1~1~ 169 S.Y. I~:~ $16.26 ~__4~Z~ '$2,747.94 :~5 '?'~ LIME STABILIZATION t~=l 185 S.Y. I ' $1.20 1 ~-- · $222.00 ~ -- LIME ~. '~ 3 TON '')~'-- $66.00 ~ ~O -- * $258.00 40 -- HANDICAP RAMP 2 EA. $450.00 $900.00 SAW CUT AND REMOVE CURB & GUT. ~ 70 L.F. lC) -- $10.00 b~O -- e .$700.00 '~O -- 4' SIDEWALK 300 S.F. $5.00 ..."/ /~1 ,500.00 SUB'TOTAL PAVING & EXCAVATION -' ~ $6,897.94 O/C~ ' TOTAL 812,161.3 '75 q ' I Soo 12:48 PM Page I