Riverview Estates-CS 971124TRANSMITTAL
CCM ENGINEERING CORP.
I I ~0 EMPIRE CENTRAL PLACE, SUITE ,3,08
DALLAS, 'TEXAS 75:~47
E I 4-630-5 ~'00
FAx: ~' I 4-905-9393
To.'
Ken Griffin, P.E.
City of Coppell
Date:
November 24, 1997
Ref:Fr°m: ~T°mmy N. Cansler ~ ~
Ken,
Enclosed are the following items as requested by Larry Davis per his letter dated November 14,
1997 regarding items that needed to be completed prior to final acceptance.
Lot elevation certification
Paving certification
As-Builts (delivered earlier with revisions per Larry Davis' comments)
Certified print of the south property line showing the grades of the swale and inlets.
Also included is a cost break down of the connection of Glade Drive from Longmeadow Drive to
the west property line of this site.
Sincerely,
CCM Engineerin. -,orporation
1120 EMPIRE CENTRAL PLACE · SUITE'#308
DALLAS, TEXAS 75247
(214) 630-5200 · FAX (214) 905-9393
City of Coppell
Attn: Larry Davis
255 Parkway Blvd.
Coppell, TX 75019
November 17, 1997
Ref: Riverview Estates
To Whom it concerns,
I, JeffD. Crannell,P.E., do hereby certify ,that to the best of my knowledge, the street paving and
the lot elevations for Riverview Estates, Coppell, TX were completed and were built in
accordance with the approved "As-Built" Construction Plans.
CCM ENGINEERING CORP.
RIVERVIEW ESTATES 11/24/97
COPPELL, TEXAS
Connection of Glade Drive From Longmeadow
to West Property Line.
ITEM QUANTITY UNIT BID AMOUNT COST
STORM SEWER
18" R.C.P. 45 L.F. $14.52 $653.40
10' INLET 2 EA. $2,050.00 $4,100.00
REMOVE EXISTING "Y" INLET 1 L.S. $500.00 $500.00
SUB-TOTAL STORM SEWER $5,253.40
PAVING & EXCAVATION
SITE EXCAVATION --~o 380 C.Y. Ir~..~~ $1.50 5~' ~$570.00 4~.~-'°
6"'3600 P.S.I. PVMT W/ INT. CURB 1~1~ 169 S.Y. I~:~ $16.26 ~__4~Z~ '$2,747.94 :~5 '?'~
LIME STABILIZATION t~=l 185 S.Y. I ' $1.20 1 ~-- · $222.00 ~ --
LIME ~. '~ 3 TON '')~'-- $66.00 ~ ~O -- * $258.00 40 --
HANDICAP RAMP 2 EA. $450.00 $900.00
SAW CUT AND REMOVE CURB & GUT. ~ 70 L.F. lC) -- $10.00 b~O -- e .$700.00 '~O --
4' SIDEWALK 300 S.F. $5.00 ..."/ /~1 ,500.00
SUB'TOTAL PAVING & EXCAVATION -' ~ $6,897.94 O/C~ '
TOTAL 812,161.3 '75 q '
I Soo
12:48 PM Page I