Riverview Estates-CS 971217The City With A Beautiful Future
P.O. Box 478
Coppell, Texas 75019
214-462-0022
Decemnber 17, 1997
Donald B. ~s
Huffines & Partners, Inc.
8222 Douglas Avenue, Suite 660
Dallas, Texas 75225
This lettex is written as a follow-up to cost infommffon provided frcan CCM Fmgimxa-ing concemi~ the extension
of Glade Point Drive within the Eagle Point Subdivisica~ In June, 1993 City Council approved an escrow
agreement with the developers of Eagle Point Subdivision for the construction of Glade Point Drive within Eagle
Point Subdivision. That escrow agxeement included:
68 LF saweut remove concrete paving ~ $10
70 CY of excavation ~ $1.25
2.8 tom lime ~ $75
189 SY stabilized subgrade ~ $1
176 SY concrete paving $14.16
Total
$ 680.00
$ 87.50
$ 210.00
$189.00
$2,492.16
$3,658.66
With interest, that amount has now grown to $4,550.97.
Based on information provided by Tcxnmy Canslor the cost on your project included:
70 LF sawcut remove concrete paving (~ $10
380 CY of excavation ~ $1.50
3.0 tons lime (~ $86
185 SY stabiliz~ subsradc (~, $1.20
169 SY concrete paving $16.26
Total
$ 700.00
$ 570.0o
$ 258.0O
$ 222.00
$2,747.94
~4,497.94
Because the above are the only items that Council considered for this escrow agreement, a check in the amount of
$4,497.94 will be prodded in the near future. Per the escrow agreement, the balance of $53.03 is being refimded
to the Eagle Point Devdopment Limited.
If you should have any questions please feel free to ~ this office at your convenimce.
Sin~. ly, _~.
Director of Engineering and Public Works