Loading...
Riverview Estates-CS 970227The City With A Beautiful Future P.O. Box 478 Coppell, Texas 7501 214-462-0022 Johnny Thompson 1780 East Beltline Coppell, TX 7~019 February 27, 1997' Riverview Estates Development Fee Assessment Dear Mr Thompson: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $201,765.00 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer"s estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Deparunent will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to working with you on this project. If you have any questions, please contact me. Sincerely, Ke ~nn~eth M. Grift-m, P.E. Assistant City Manager/City Engineer CC: Jennifer Armstrong, Finance Director F. nsin recUniciau Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Gary Sims, Dir. Leisure Services i EVELOPMENT FEE TABLE Project: Riverview Estates Date: 2/2 79 7 TOTAL ~ FEES DUE Water Impact' Fe~ .................. ' ~0'8~15.0~ $30,825.00 (100% due prior to Council Approval) Water Tap Inspection Fee $3,350.00 000% due at Issuance of Water Meter) Water Meter Fee (Domestic) $1,531.86 (100% due at Issuance of Water Meter) Water Meter Fee (h-rigatiolOFireline) $48.30 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $1,980.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $35.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $29,700.00 $29,700.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $3,300.00 (100% due at Issuance of Building Permi0 Utility Final Inspection Fee $3,300.00 (100% due at Issuance of Building Permit) Park Fee $84,810.00 $84,810.00 (100% due prior to Council Approval) Roadway Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee ~' ~_lI gO"/.l"& toa~,~ Need submittal of · ~/'~,,J i,,~/,a.,~.~ ~Jl~t '/5q,$$" ~-~, W~i~,t ~.,~?, development contracts ~J~(~7' l] TOTAL $158,880.16 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL * $145,335.00 OWNER Quantum Contracting, Inc. RIVERVIEW ESTATES HUFFINES & PARTNERS EXHIBIT "B" DESCRIPTION WATER, SEWER & ST. SEWER ENGINEER LOCATION COPPELL DATE 3-19-97 PROPOSkL TEM O. DESCRIPTION QUANTITY UNIT UNIT BID TOTAL STORM SEWER 18" RCP 21" RCP 24" RCP 27" RCP 30" RCP 33" RCP 36" RCP MANHOLES 10' INLET WYE CONNECTION CONCRETE FLUME TYPE B HEADWALL 8" AREA DRAIN PIPE AREA DRAIN UNITS GRADE TO DRAIN DISCHARGE DBL. 30" TYPE B HEADWALL JUNCTION BOX ON DBL. 30" SUB TOTAL STORM SEWER WATER 8" WATER 12" WATER 6" GATE VALVE 8" GATE VALVE 12" GATE VALVE FIRE HYDRANT FITTINGS 1" SERVICES/METER BOX CONN. TO EXIST. CONCRETE BLOCKING WATER TESTING SUB TOTAL WATER SANITARY SEWER 10" SANITARY SEWER 4' DIA. MANHOLE SEWER LATERALS CLEANOUT ' BORE CONN. TO EXIST. CONCRETE ENCLASEMENT TRENCH SAFETY SEWER TEST 138 LF 13.52 1,865.76 135 LF 25.18 3,399.30 369 LF 27.27 10,062.63 828 LF 30.48 25,237.44 1015 LF 34.25 34,763.75 219 LF 39.56 8,663.64 145 LF 45.82 6,643.90 3 EA 1160.00 3,480.00 15 EA 2050.00 '.. 30,750.00 13 EA 325.00 4,225.00 20 LF 36.00 720.00 1 EA 850.00 850.00 1156 LF 8.38 9,687.28 20 EA 180.00 3,600.00 1 LS 1500.00 1,500.00 1 EA 1900.00 1,900.00 1 EA 3900.00 3,900.00 151,248.70 3265 LF 12.02 39,245.30 1400 LF 15.20 21,280.00 6 EA 349.00 2,094.00 8 EA 473.00 3,784.00 3 EA 817.00 2,451.00 6 EA 1050.00 6,300.00 2.4 TN 3500.00 8,400.00 66 EA 377.65 24,924.90 2 EA 250.00 500.00 25 CY 75.00 1,875.00 4665 LF .33 1~539.45 112,393.65 3410 LF 12.25 41,772.50 11 .EA 1198.00 13,178.00 66 EA 190.00 12,540.00 1 EA 320.00 320.00 50 LF 116.86 5,843.00 1 LS 250.00 250.00 200 LF 10.22 2,044.00 3410 LF .27 920.70 3410 LF 1.02 3,478.20 P. O. Box 397 (CONTINUED) Rock'wall, Texas 75087 Metro 972-771-9511 Fax 1- 972-722-1114 EXNIBIT "B" Quantum Contracting, Inc. QUANTITY UNIT SUB TOTAL SANITARY SEWER PAVING & ESCAVATION NO BID UNIT BID TOTkL 80,346.40 ADDITIVE ALTERNATE #1 BENCH LOTS TO GRATE NO BID BONDS TOTA~ BASE BID WATER, SAN. SEWER.& ST. SEWER NOTES: NO INSPECTION.FEES ARE PROVIDED FOR NO TAP OR METER FEES"ARE PRI~IDED"FOR' " ASPHALT ROAD REPAIR FOR SHADY .TRAIL IS INCLUDED NO CONSTRUCTION STAKING IS PROVIDED FOR ~ .o4 P. O. Box 397 Rockwall, Texas 75087 Metro 972-771-9511 Fax 1- 972-722.1114 >97 17:12 HUF~'~ES & PART.RS, INC. -~ CITY OF C~LL $...co._.. & S O.S EXCAVATING, INC. Ap~l 2, 1997 Huffines & Partners 8222 Douglas Ave. - $. Dallas, Texas 75225 ATTENTION: GENTLEMEN: PROJECT: LOCATION: Tommy Caflsler We propose to furnish all labor, materials and equipment necessary to construct l~o following desm~becl wo~: Rivervlew Estates Coppell, Texas Item 1 2 3 4 5 Paving Desertion Quentit~ 8" 3600 P.$.I. Pvmt w/Int. Curb 6" 3600 P.S.I. Print. w/Int. Curb Alley Pavement Lime Stal~llzalion Lime Sawcut, Break & Remove Concrete Unit Unit Bid Total Bid 1,920.00 SY 18.54 35,596.80 9,380.00 SY 16.51 154.863.80 3,183.00 SY 18.92 60~22.36 15,150.00 SY 1.20 18,180.00 211.00 TN 86.00 18,146.00 50.00 LF 10.00 SO0.00 7 Handicap Ramp 8 Brick Pavers 9 Temp. AC. Pavement Paving Total Bond costs have been added to this proposal. QUALIFICATIONS_.- 8.00 EA 300.00 2,400.00 385.00 SF 8.00 3,080.00 350.00 SY 20.00 7,000.00 259,988.H Units are based on CCM Engineering Corporation plans Dated: Nov. 12, 1996 - Recieved: Jan. 17, 1997. No Permits or Fees ~,~.~~ - No Landscape, ,rrigalion, Electrical Adjustments or Repairs No Permanent Traffic Markings or Signage No Erosion Control No Street Lighdng No Geotechnical Testing We have quoted this project on a unit price basis, any work not specir~-aily quoted o--~ 1[ · O qual~,,~t included in this proposal. ,2 PA UTILITIES · P.O. BOX Z4g ,, LEWISVfLLE. TEXAS 75067-0248 · (g,"2) 221-35M · ENGINEERING FAX (972! 436-B364 PAVING EXCAVATING · PO 60Xg30327 · WlXOId. MICHIGANdI393-O32r7 · (810)~r~6.3113 · Fa-(810)Gsg-2q-G5 · FINANCE FA:((g;zI 219-;~§~ Ut::VELOPMENT FEE WORKSHEEr PROJECT: Riverview Estates DATE: 2/2 7[9 7 Water Impact Fee: Domestic Meter(s): Irrigation Meter(s): Fireline Meter(s): 66 - 5/8 inch X 3/4 inch = 66 ESU's 1 - I inch = 2.5 ESU's = ESU's 0 - N/A = ESU's Total #: 68.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 67 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic): Total #: 66 Domestic Meter(s) @ $23.21 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (lrrigation/Fireline): Total #: 1 Irrigation Meter{s) @ Total #: 0 Additional Irrigation Meter(s) @ Total #: 0 Fireline Meter(s) @ (100% due prior to issuance of water meters) $48.30 Water Meter Deposit Fee (Domestic): Total #: 66 Meter(s) @ $30.00 ea. {100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: I Mater(s) @ 035.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 66 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 66 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (Ali developments): Total #: 66 Lots @ $50.00 ea. {100% due prior to issuance of building permit) $30,825.00 $3,350.00 $1,531.86 $48.30 $0.00 $0.00 $1,980.00 $35.00 $29,700.00 $3,300.00 $3,300.00 Page I DEVELOPMENT FEE WORKSHEET Park Fee (For Resdential Developments Only): * Preliminary plat approved prior to June 23, 1992: Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit} * Preliminary plat approved after October 26, 1993: 66 N/A Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations} Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) N/A N/A N/A N/A $84,810.00 N/A $0.00 Information not available at this time Infer'marion not available at thie time Need submittal of development contracts + See attached letter Page 2 ROADWAY IMPACT FEE CALCULATIONS PROJECT: ~iwrview DATE: 2/27/§7 ROADWAY IMPACT FEE: Sategory ** Land Use ** Building Size (Sq .Ft ) Development Units ** Vehicle Miles per Development Unit Fee per Vehicle Mile *** Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = Single-Family Detached N/A 66 285 $300 $56 d30 00 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2 ,Page 3 - Roadway Impact Fee Study) Consent agenda item 8C on the September 10, 1996 City Council meeting agenda was approved to accept right-of-way dedication in lieu of roadway impact fees. AMO ~TD U~: $0 00