Peninsulas-LR 950629 ALPHA TESTING, INC. REPORT OF CONCRETE
2209 W,sconsln st COMPRESSION TEST
Suite 100
Dallas. Texas 752:>9
,'//
-., (214) 620-8911
TF%TED'cOR PERRY HOMES, INC. DATE JUNE 29,1995
HOUSTON, TEXAS
P.oJEc~ HACARTHUR PARK OUR REPORT NO. 94526-38
COPPELL, TEXAS
:FIELD DATA
LOCATION OF CONCRETE PLACEMENT STROM DRA I N INLET AT
STATION 1+45 OF LINE C
DATE PLACED 06/29/95 PLANT 5
TIME 02: 35 DELIVER TICKET NO. 55094
SLUMP 4 MIX PROPORTIONS (SSD) N/A
AIR CONTENT N/A CEMENT N/A
AIR TEMPERATURE 90 WATER N/A
CONCRETE TEMPERATURE 91 FINE AGGREGATE N/A
DATE RECEIVED 06/30/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY GM ADMIXTURE N/A
MIX DATA SUBMI'I~'ED aY RED I -M I X
COMPRESSION TEST RESULTS REMARKS
(NOMINAL CYLINDER SIZE 6- X 12"l ~/'"'-'Cylinders made by ALPHA
representat,ve.
Lab. Cultomlr TyI~ Dill Oa'~l Cornm'e~,ve ,_'~ Cylinders made by Architect's
, No. No. Curin9 Telted St~en~h. Pit or Contractor's representabve.
76 94526 LAB 07/06/95 7 3440 '-/"~ylinders picked up by ALPHA
laboratory.
77 94526 LAB 07/27/95 28 4650 [] Cylinders delivered to ALPHA
laboratory.
78 94526 LAB 07/27/95 28 4740 ~L--.~mpress~on test results comply w~th
applicable specifications.
79 94526 L A B HOLD H [] Compression test results do nol comply
with applicable spec,licahons.
L~
~ AI"P ~ ,J~;,/1' E ST rN G, iNC
ALPHA TESTING, INC. REPOR'~ OF CONCRETE
· -,. 2209 w,sco s,n s, COMPRESSION TEST
. i(..,?~ Suite 1OO
.;.. Dallas. Texas 75229
'"'"' (214) 620-8911
PERRY HOMES, INC. DATE JUNE 29,1995
HOUSTON, TEXAS
P.oJEc~ HACARTHUR PARK OUR REPORT NO. 94526-38
COPPELL, TEXAS
FIE LD DATA
LOCATION OF CONCRETE PLACEMENT STROH DRA I N INLET AT
STATION 1+45 OF LINE C
DATE PLACED 06/29/95 PLANT 5
TIME 02: 35 DELIVER TICKET NO 55094
SLUMP 4 MIX PROPORTIONS (SSD) N/A
AlE CONTENT N/A CEMENT N/A
AIR TEMPERATURE 90 WATER N/A
CONCRETE TEMPERATURE 9 I FINE AGGREGATE N/A
DATE RECEIVED 06/30/95 COARSE AGGREGATE N/A
FIELD DATA SUBMITTED BY GH ADMIXTURE N/A
MIX DATA SUBMITTED BY RED I -H I X
REMARKS
COMPRESSION TEST RESULTS
(NOMINAL CYLINDER SIZE 6" X 12"1 ..~,'""Cylinders made by ALPHA
representahve
Lab Customer i Type Date Aee Coml~e~i~e ,_.' Cylinders made by Architect's
. No No. i Cur,n~ Te~ted Days Strength, P~ or Contractor's representative.
.'~'""(~ylinders p~cked up by ALPHA
'76 94526 LAB 07/06/95 7 ' 3440
laboratory.
77 94526 LAB 07/27/95 28 ~ Cylinders dehvered to ALPHA
laboralory.
78 94526 L A B 07 / 27 / 95 28 ~ Compression test results comply w~th
applicable specifications.
79 94526 LAB HOLD H ~ Compression test results do nol compty
with applicable specifications
isr..~-'.~.,-o-, 28 3000
TYPE OF FRACTURE, IF OTHER
THAN
DAY I . ~ t:~'~ NER
ReproOf ully Subm~tled
AEPH~ TESTING, lNG