Shadow Woods-CS 891114COPPEL~. PUBLIC WORKS DATE TO: F ROM November 14, 1989 Dale Jackson, Building Official Russell R. Doyle, City Engineer Shadow Woods Addition- 2'Models Shadow Ridge Addition IA- 3 lots Request for Building Permit Prior to Infrastructure Acceptance Steve. Stolte has requested that building permits be issued for subject lots prior to the completion and acceptance of the infrastructure. He indicated that you requested a notification from this department and the Fire Marshal. As we understand, the Fire Marshal has requested a hard surface access and city water be available. As Larry Davis has indicated to the Developer's representatives, we must have water and sewer systems in and backfilled, all in compliance with approved construction drawings, etc. and no doubt per the Fire Marshal's requests a hard all-weather surface is required from the Coppell Road to each building/house for the Shadow Woods Addition request. As has been discussed, the other necessity is to have the concrete street approaches to Coppell Road in place and cured out before any house contractor access is permitted into the Shadow Woods Addition. Therefore, if these conditions are satisfied, then we would have no objections for subject request to be granted. Of course, the details and process is subject to Larry Davis' review and approval as the Developer accomplishes what is required so that there is no adverse burden placed on the City's field inspection operations, etc. Please let us know if you have any questions and please contact Larry Davis or myself for any other control or policy questions. Thank you. RRD/bb xc: Steve Goram, Director of Public Works Larry Davis, Construction Inspector Steve Stolte, Centex, Inc.