Loading...
River Ridge Add-LR 940519 2575 Lone Star Drive · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 / FAX (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CUENT: RBR, Inc. Attn: Bobby Rollings P.O. Box 796303 Dallas, TX 75379-6303 CLIENT NO.: 3452351 REPORT NO.: 99013 PROJECT: River Ridge Addition DATE OF SERVICE: 4/21/94 Coppell, Texas AUTHORIZATION: REPORT DATE: 5/19/94 $£RVlCE$: Sample concrete at location of placement, perform req,.'-ired field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: Parco CLASS OF CONCRETE: N/A CONCRETE SUPPLIER: On site DATE OF PLACEMENT: 4/21/94 PLANT: N/A TIME SAMPLED: 08:45AM BY: James Ledbetter SPECIFICATION REQUIREMENTS TEMPERATURE ('F) - AIR: 67 CONCRETE: 81 STRENGTH: 3600psi @ 28 DAYS TRUCK NO: 6-3 TICKET NO: N/A SLUMP: 5" AIR CONTENT(%): 3.3 AIR: 4.0% LOCATION OF PLACEMENT: METHOD OF TEST: ASTM C-39 Paving alley C 1+60 10' east ASTM C-143 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 8 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches} TESTED (days) Obs. force) (;3s~ REMARKS 1 1 3.50 4/28/94 7 81300 2870 1 2 3.50 4/28/94 7 84500 2990 1 3 3.50 5/19/94 28 97300 3440 /-- ~- ~-' ~"J 1 4 3.50 5/19/94 28 102900 3640 Technician: James Ledbetter Started: 06:00AM Stopped: 12:30PM Report Of Tests Continued On Page 2 ." /~"~ '. '"- Our letters and reports are for the exclus ve use of the client to whom they are addressed and shall not be rel0roduced exce[ot in 1001 CME full ivW~oh~Ut.the. Lapprova! o.f th.e.testi.n.g .Iqboratory. The use of our name must receive our written approval. Our letters and reoorts apo y o y [o [ne samom testeo aha/or msf3ecte~l, and are not inclicatwe of the ClUantitles of apl3arently iclentlcal or similar oroducts. RBR, Inc. REPORT NO. 99013 CLIENT NO. 3452351 PAGE 2 DATE OF SERVICE: 4/21/94 SET NO. 2 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Coflt inued) PROJECT DATA CONTRACTOR: Parco CLASS OF CONCRETE: N/A CONCRETE SUPPLIER: On s~.te DATE OF PLACEMENT: 4/21/94 PLANT: N/A ~ME SAMPtED: Il: 20AM BY: James Ledbetter SPECIFICATION REQUIREMENTS TEMPERATURE ('F) - AIR: 78 CONCRETE: 84 STRENGTH: 3600psi @ 28 DAYS TRUCK NO: 6-2 TICKET NO: N/A SLUMP: 5" AIR CONTENT(%): 4.1 AIR: 4.0% LOCATION OF PLACEMENT: METHOD OF TEST: AST~ C-39 Paving alley A §rid 2+25 10' west ASTM C- 143 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. (inches) TESTED (days) (lbs. fome) (Ds~ REMARKS 2 1 3.25 4/28/94 7 74900 2650 2 2 3.25 4/28/94 7 84100 2970 2 3 3.25 5/19/94 28 99500 3520 ~-~ ~'~' 2 4 3.25 5/19/94 28 101000 3570 ~- L-~ ~'J Technician: James Ledbetter Report Distribution: (1) RBR, Inc. Southwestern Laboratories, Inc. (1) CCtl Engineering ,,, n (1) City of Coppe[[ ~'. Ki g , ~,.E. Our letters and reports are for the exclus ve use of the client to whom they are addressed and shall not be reproduced except in 1001 CME full wtthout the approval of the testnq alooratory. The use of our name must receive our written approval. Obr letters and rei~orts apply only to the sample tested ancl/Or inspected, and are not indicative of tl~e quantities of apparently identical or similar products.