Loading...
River Ridge Add-LR 940518 2575 Lone Star OHve · P.O. Box 224227 · Dallas, Texas 75222 (214) 631-2700 / FAX (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CLIENT: RBR, Inc. Attn: Bobby Rollings P.O. Box 796303 Dallas, TX 75379-6303 CLIENT NO.: 3452351 REPORT NO.: 98995 PROJECT: River Ridge Addition DATE OF SERVICE: 4/20/94 Coppell, Texas AUTHORIZATION: REPORT DATE: 5/18/94 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: Parco CLASS OF CONCRETE: Mix number 3600 CONCRETE SUPPLIER: On Site DATE OF PLACEMENT: 4/20/94 PLANT: N/A TIME SAMPLED: 01: 50PM BY: Patrick Wallace SPECIFICATION REQUIREMENTS TEMPERATURE ('F) - AIR: 75 CONCRETE: 80 STRENGTH: 3600psi @ 28 DAYS TRUCK NO: N/A TIC,KET NO: N/A SLUMP: 3" AIR CONTENT(%): 3- 5 AIR: 3- 6% LOCATION OF PLACEMENT: METHOD OF TEST: ASTM C-39 Alley A 5+00 ASTM C- 143 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET' NO. (inches) TESTED (days) (lbs. force) (ps~ REMARKS 1 1 1.50 4/27/94 7 89500 3160 1 2 1.50 4/27/94 7 89200 3150 1 3 1.50 5/18/94 28 117400 4150 1 4 1.50 5/18/94 28 111200 3930 Technician: Patrick Wallace Started: ll:00AM Stopped: 05:00PM CME Technician Report Of Tests Continued On Page 2 Our letters and reports are for the exclusive use of_the client to whom they are addressed and shall not be reproduced except in 1001 CME full without the approval of the testln¢] ~boratory. ~ne use of our name must receive our w~ltten approval. Our letters and reports apply only to the sample tested and/~r inspectei~, and are not indicative of the quantities of apoarentTy identical or similar prooucts. RBR, Inc. REPORT NO. 98995 CLIENT NO. 3452351 PAGE 2 DATE OF SERVICE: 4/20/94 SET NO. 2 REPORT OF CONCRETE COMPRESSIVE STRENGTH (Continued) PROJECT DATA CONTRACTOR: Parco CLASS OF CONCRETE: Mix number 3600 CONCRETE SUPPLIER: On Site DATE OF PLACEMENT: 4/20/94 PLANT: N/A TIME SAMPLED: 03: iOPM BY: Patrick Wallace SPECIFICATION REQUIREMENTS TEMPERATURE ('F) - AIR: 80 CONCRETE: 81 STRENGTH: 3600psi @ 28 DAYS TRUCK NO: N/A TICKET NO: N/A SLUMP: 3" AIR CONTENT(%): 3 - 5 AIR: 3- 6% LOCATION OF PLACEMENT: METHOD OF TEST: ASTM C-39 Alley D 4+5.0 ASTM C- 143 REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 6 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO~ (inches) TESTED (days) (lbs. force) (psi) REMARKS 2 1 1. O0 4/27/94 7 107100 3790 2 2 1. O0 4/27/94 7 122700 4340 2 3 5/18/94 28 2 4 5/18/94 28 Technician: Patrick Wallace CME Technician Report Distribution: (1) RBR, ~nc. Southwestern La~ 13~. (1) CCN Engineering (1) Parco Utilities, Inc. (1) City of Coflpel.[ F. King Cook, P.E. ~O¥1r.!e._~?s~ a. gnd reports .are. f..or the .exclgs. lve u. se of_the client.to whom they are ad~lressed and shall not be reproduced except in 1001 CME r.u.'~t~n~.?e..a_P_pr_o_v~_o~ [n.e.tes~i~n.~l ~aooratgry~. in.e use OT pul name must receiv9 our w~itten approval. Our letters and reports =~"x uHx .u ,.~ =~,r,p,e [es[eo anQ/or inspeczeo, aria are not !ndlcatlve of the quantities of apparently identical or s,m,lar Drocructs. 2575 Lone Star Ddve · P.O. Box 224227 · D~s. Texas 75222 (214) 631-2700 / FAX (214) 920-1891 REPORT OF CONCRETE COMPRESSIVE STRENGTH CUENT: RBR, Inc. ArCh: Bobby Rollings P.O. Box 796303 Dallas, TX 75379-6303 CLIENT NO.: 3&52351 REPORT NO.: 98994 PROJECT: River Ridge Addition DATE OF SERVICE: 4/20/94 Coppell, Texas AUTHORIZAT]ON: REPORT DATE: 5/18/94 SERVICES: Sample concrete at location of placement, perform required field tests, prepare and test concrete compressive strength specimens. PROJECT DATA CONTRACTOR: Parco CLASS OF CONCRETE: N/A CONCRETE SUPPLIER: Parco DATE OF PLACEMENT: 4/20/94 PLANT: On site ]~ME SAMPLED: 11: 00AM BY: Charles Ray SPECIFICATION REQUIREMENTS TEMPERATURE ('F) - AIR: 82 CONCRETE: 84 STRENGTH: 3000psi @ 28 DAYS TRUCK NO: N/A ~CKET NO: N/A SLUMP: 3- 5" AIR CONTENT(%): 4.3 AIR: 3.5- 6.5% LOCATION OF PLACEMENT: METHOD OF TEST: ASTM C-39 Cul-de-sac at west end of Bradford Dr. from ASTM C-143 10+75 to west curb sample at 10+75 to 10+85 from north curb to 10fi south REPORT OF TESTS CONCRETE COMPRESSIVE STRENGTH - 8 X 12 CYLINDERS CYLINDER MEASURED MAXIMUM COMPRESSIVE MARKED SLUMP DATE AGE LOAD STRENGTH SET NO. {inches) TESTED (clays} (lbs. force) (os~ REMARKS 1 1 4.00 4/27/94 7 79400 2810 1 2 4. OO 4/27/94 7 84800 3000 1 3 4.00 5/18/94 28 111700 3950 1 4 4.00 5/18/94 28 111100 3930 ADDITIONAL COMMENTS: Cylinders marked set ~2 Technician: Charles Ray Started: 09:30AM Stopped: ll:30AM Report Distribution: Southwestern Laboratories, Inc. (1) RBR, In~. (1) CCH Engineering (1) PatCO Utilities, Znc. .,~,,..~ ~------~, (1) City of coppett F. King doo~, P.E. Our letters and reDorts are for the exclusive use of the client to whom they are addressed and shaft not be reDroduce(~ except in 1001 CME full without the alN~roval of the testing mOoretory, The use of our name must receive our written spproval. Our letters anti reports al~ply only to the samole tested and/Gr inspectei~, and are not indlcattYe of the Quantities Of aODarently i~entic&i or similar Droouct$.