Loading...
Riverview Estates-CS 911114The City With A Beautiful Future November 14, 1991 COPY P.O. Box 478 Coppell, Texas 75019 214-462-0022 Mr. Mike Daniel, P.E. Nathan D. Maier Consulting Engineers, Inc. Three Northpark 8800 N. Central Expressway, Suite 300 Dallas, TX 75231 Re: Proposed Reclamation Project Riverview Estates Dear Mr. Daniel: On November 12, 1991, I received your follow-up letter to our telephone conversation held on 11-5-91, regarding reclamation of the proposed Riverview Estates. It came to my attention that said letter did not fully represent my comments. As a point of clarification, ! forward this letter with my comments concerning your project, which, as minimum, must be addressed: This development must be in full compliance with the City of Coppell's Floodplain Ordinance #87390. A wetland determination must be obtained as soon as possible, to identify existence of any wetlands. All necessary permits must be obtained from other entities such as federal (including the Corps of Engineer's (COE) 404 Permit), and state governments, if applicable. This tract is within the regulator~ zone of the Elm Fork of the Trinity River, and the City is participating in the Trinity River Corridor FloodDlain Management. We recommend this project to be in compliance with the Corridor Development Certificate (CDC) manual and criteria. However, according to our legal council, the CDC permitting process can not be enforced, since it has not been adopted by the City Council. I also indicated that in the City-Wide Storm Water Management Plan, it is proposed that" . no reduction in valley storage for the 100-year flood (fully developed watershed) be allowed along Elm Fork of the Trinity River. Letter to Mr. Mike Daniel, P.E. November 14, 1991 Page 2 That the "no loss in valley storage" requirement is not outlined in detail in the Floodplain Ordinance #87390. Please note that as per Art. 4C-c, Pg. 24, you must ... demonstrate with technical data, the impacts on the design base flood storage capacity of the floodplain for all developments, which include fill within the floodplain . . . Once you submit all necessary flood study reports and documents, they will be reviewed according to Ordinance #87390 for compliance. Upon approval, City staff will request a conditional LOMR from FEMA, prior to issuance of Floodplain Development/Fill permit. The minimum finished floor of residential lots must be elevated to a minimum of two (2) feet above the FIS base flood elevation, or to one (1) foot above the design base flood (ultimate condition) elevation, whichever is higher. It is my understanding and as you may know, the City Council is interested in procuring additional dedicated land for a part site/open space as part of this development. This is a desirable use of land within the limits of floodplain. We look forward to working with you on this project and should you have any additional questions, please do not hesitate to call me. Sincerely, ~.~.~ / M. Shohre Danestuuand, P. E. Acting City Engineer MSD/bd cc: Gary L. Sieb, Director of Planning and Community Services Don E. Huffines, Huffines & Partners Gary C. Hendricks, P.E., Shimek, Jacobs & Finklea RIVERLT