Loading...
Riverview Estates-CS 911105_NDM NATHAN D. MAIER CONSULTING ENGINEERS, INC. November 5, 1991 Ms. Shohre~~m~ C~y of c,oppe, 255 Pe~way Blvd. CoPl;~II, Texas 75019 ~V - 7/99I Re: Riverview Estates NDM No.: 91-08-075 Dear~hohm: The purpose of this letter is to memorialize our telephone conversation of this date regarding the above referenced pro~ect. Our conversation represented the City of Coppell's formal response to my letter to you, dated October 14, 1991, requesting clarification on the reclamation process for this site..~ UoJc ~J3 ~ During our conversation, you stated that the developer's responsibility includes and~is limited t__o the 1. We must obtain a wetlands determinatiOn from the Corps of Engineers (COE). If the COE determines that wetlands exist on the site, we must obtain a 404 permit. 2. We must prepare a hydraulic report for submission to the City. The City will forward our report to FEMA and request a "Conditional Letter of Belief" from FEMA. 3. Upon receipt of the Letter ef belief, we will be free to begin reclamalton work on the site, The fill will be placed to an elevaiton which conforms t,~_~he City of Coppell's~zninimum'"'~*~- * .. ? requirements for street.s and finished floors. J ~ '~ ' " ^~it~, you" r~he% ~ r~'~p~qns~,b,~ies re~ating to val~W storege, un~e=i ~'?~'~, man(lated by lhe COE, and that w~~ed Io seek approval lor the reclamation from the Please understand that my client intends to proceed with this porject and incur costs based upon the content of our discussion. Thank you for taking the time to research this information and passing it along to us. NATHAN D. MAIER Mike Daniel, P.E. CMD/rdp Three NorthPark/8800 N. Central Expwy./Suite 300/Dallas, Texas 75231/(214) 739-4741