Loading...
Riverview Estates-LR 970813ALPHA TESTIN(~"~,~NC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPOHT OF FIELD COMPACTION TESTS TESTED FOR HUFFINES & P~tTNERS C/O CCH ENGINEERING DALLAS, TEXAS DATE 08/13/97 PROJECT OUR REPORT NO, RIVERVIEW ESTATES 97224-36B COPPELL, TEXAS TEST DATA: TEST I D~E - ~ EL~. SOIL ID OFTIMUM MAXI~M LAB IN PLACE IN PLACE PERCE~ COMMENT* ~ISTURE DRY ~1~ MOISTURE DRY D~S~ C~PACTION NO. DE~~ NUMBER % ~F % ~F 209 08/13 FG 4L 21.3 95.2 22.8 92 97 3-AD 210 08/13 FG 4L 21.3 95.2 23.1 92 97 3-AD 211 08/13 FG 6L 17.5 99.5 20.0 97 98 3-A 212 08/13 FG 6L 17.5 99.5 20.2 102 102 3-A 213 08/13 FG 6L 17.5 99.5 20.2 93 97 3-A TEST LOCATION: ~09 PAVING - RETEST OF TEST ~207 ON 08/12/97 ~10 PAVING - RETEST OF TEST #208 ON 08/12/97 !11 PAVING - GRAPEVINE STREET AT STATION 1+00 ~12 PAVING - GRAPEVINE STREET AT STATION 4+79 ~13 PAVING - GRAPEVINE STREET AT STATION 9+60 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS~.~~- ' C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS D. RETEST ALPHA TESTING, INC.. 2209 Wisconsin St. ~ Suite 100 Dallas, Texas 75229 (972) 620-8911 ME~._~[-IANICAL STABILIZATIL .~1 / MODIFICATION FINAL MIX TESTED FOR HUFFINES & PARTNERS C/O CCM ENGINEERING DALLAS, TEXAS DATE 08/13/97 PROJECT RIVERVIEW ESTATES COPPELL, TEXAS Area ~ Wo~: VARIOUS STREETS OUR REPORT NO. 97224-36C Date cement [] lime [] initially applied Date of final mixing 0 8 / 13 / 9 7 Sample Location: 08/12/97 RT,KPORK @ STA: 1+50 R[VERV!RW @ RTA: 0+50 Average final compacted depth: 100% ! 3/4 60% #4 100 72 100 71 7 inches. Remarks: COMPUDATA-CG01083-93