Loading...
Riverview Estates-LR 970715ALPHA TESTING, INC. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 DAILY FIELD REPORT TESTED FOR HUFFINES & PARTNERS C/O CCM ENGINEERING DAT~ 07/15/97 PROJECT RIVERVIEW ESTATES COPPELL, TEXAS OUR REPORT NO. 97224-19 WEATHER: CLOUDY TEMPERATURE RANGE'"] 5 ALPHA Representative: J.B. TO: 95 THE ALPHA TECHNICIAN TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK AND PERFORM FIELD TESTING AS REQUESTED. SUBGRADE FOR PADS 1 THROUGH 24, BLOCK A AND PADS 6 THROUGH 13, BLOCK B WAS OBSERVED TO VERIFY THAT AREA~ HAD BEEN PREPARED IN GENERAL ACCORDANCE WITH GEOTECHNICAL RECOMMENDATIONS. A TOTAL OF 19 FIELD DENSITY TESTS WERE PERFORMED ON FILL AND NATURAL SUBGRADE FOR VARIOUS AREAS. SEE ATTACHED REPORT FOR RESULTS OF FIELD COMPACTION TESTING. THE SINACOLA REPRESENTATIVE WAS INFORMED OF ALL OBSERVATIONS AND FIELD TEST RESULTS. AT THE COMPLETION OF THE SCHEDULED TESTING THE TECHNICIAN RETURNED TO THE DALLAS OFFICE. CG01083-29 ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR HUFFINES & PARTNERS DATE 07/15/97 C/O CCH ENGINEERING PROJECT RIVERVIEW ESTATES OUR REPORT NO. 97224-19A COPPELL, TEY~AS TEST DATA: TEST DATE ~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT COMPACTION COMMENT* NO. NUMBER % PCF % PCF 78 07/15 SG 3 22.2 93.8 22.4 93 99 2-A 79 07/15 SG+0.5 2 20.5 99.5 22.1 96 97 1-A 8O 07/15 SG+t. 0 2 20.5 99.5 22.2 97 97 1-A 81 07/15 SG+i.5 2 20,5 99.5 22..2 96 96 1-A 82 07/15 SG+2.0 2 20.5 99.5 23.5 95 95 1-A 83 07/15 SG 3 22.2 93.8 22.2 89 95 2-A 84 07/15 SG 3 22.2 93.8 22.5 89 95 2-A TEST LOCATION: 78 RI%rERVIEW DRIVE AT STATION #2+50 79 RIVERVIEW DRIVE AT STATION %2+50 8o RIVERVIEW DRIVE AT STATION #2+50 81 RIVERVIEW DRIVE AT STATION #2+50 82 RIVERVIEW DRIVE AT STATION #2+50 83 BLOCK A, PAD 1 84 BLOCK A, PA/) 3 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 ' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICS...' . ~ B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTEDFOR HUFFINES & PARTNERS DATE 07/15/97 C/O CCM ENGINEERING PROJECT I~IVERVIEW ESTATES OUR REPORT NO. COPPELL, TEXAS 97224-19B TEST DATA: TEST DATE ~1 SOIL ID OPTIMUM MAXIMUM LAS IN PLACE I. PLACE MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT NO. NUMBER % PCF % PCF COMPACTION COMMENT* 85 07/15 SG 3 22.2 93.8 23.6 90 96 2-A 86 07/15 SG 3 22.2 93.8 24.2 90 96 2-A 87 07/15 SG 3 22.2 93.8 24.9 89 95 2-A 88 07/15 SG 3 22.2 93.8 23.2 90 96 2-A 89 07/15 SG 3 22.2 93.8 23.7 90 96 2-A 90 07/15 SG 3 22.2 93.8 22.5 91 97 2-A 91 07/15 SG 3 22.2 93.8 23.0 91 97 2-A TEST LOCATION: 85 BLOCK A, PAD 5 86 BLOCK A, PAD 7 87 BLOCK A, PAD 9 88 BLOCK A, PAD tl 89 BLOCK A, PAD 13 90 BLOCK A, PAD 15 91 BLOCK A, PAD 17 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS ALPHA TESTING, 'INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 (972) 620-8911 REPORT OF FIELD COMPACTION TESTS TESTED FOR HUFFINES & PARTNERS DATE 07/15/97 C/O CCM ENGINEERING PROJECT RIVERVIEW ESTATES OUR REPORT NO. COPPELL, TEXAS 97224-19C TEST DATA: TEST DATE ~ SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE MOISTURE DRY DENSITY MOISTURE DRY DENSITY PERCENT NO. NUMBER % PCF % PCF COMPACTION COMMENT* 92 07/15 SG 3 22.2 93.8 22.7 91 97 2-A 93 07/15 SG 3 22.2 93.8 23.6 90 96 2-A 94 07/15 SG 3 22.2 93.8 25.1 90 96 2-A 95 07/15 SG 3 22.2 93.8 22.9 92 98 2-A 96 07/15 SG 3 22.2 93.8 22.5 93 99 2-A TEST LOCATION: 92 BLOCK A, PAD 19 93 BLOCK A, PAD 21 94 BLOCK A, PAD 23 95 BLOCK B, PAD 7 96 BLOCK B, PAD 9 1. FILL 2. NATURAL SUBGRADE 3. LIME STABILIZED 4. CEMENT TREATED CG01083-18 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPEClFICATIONS~~ B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS