Loading...
Riverview Estates-LR 970409ALPHA TESTING, INc. 2209 wisconsin St., Suite 100 Dallas, Texas 75229 (214) 620-8911 DALLY FIELD REPORT TESTED FOR HUFFINES & PARTNERS C/O CCM ENGINEERING DATE 04/09/97 PROJECT RIVERVIEW ESTATES COPPELL, TEXAS OUR REPORT NO. 97224-1 WEATHER: CLOUDY TEMPERATURE RANGE:7 0 ALPHA Representative: D.W. TO: 75 THE ALPHA TECHNICIi~N TRAVELED TO THE ABOVE REFERENCED PROJECT AS REQUESTED TO MONITOR ON-GOING WORK D~ND PERFORM FIELD TESTING AS REQUESTED. WHILE ON SITE THE TECHNICIi~ OBTAINED 3 SOIL SAMPLES FOR LABORATORY PROCTOR i~LNALYSIS. THE SAMPLES WERE OBTAINED FROM THE FOLLOWING LOCATIONS: -BLOCK C, PAD 10 -BLOCK B, PAD 2 -SANITARY SEWER LINE ~A' AT STATION #2+50 FG-2 LABORATORY TEST RESULTS FOR ALL RELATED ITEMS REFERENCED ~BOVE WILL FOLLOW ON A SEPARATE REPORT. AT THE COMPLETION OF ThE SCHEDULED TESTING THE TECHNICIAi~ RETURNED TO THE DALLAS OFFICE.