River Ridge Add-CS 951110November 10, 1995
Mr. Robert Rollings
RBR Properties, Inc.
13760 Noel Road Suite 620
Dallas, Texas 75240-4320
RE: River Ridge Subdivision
Final Acceptance
Dear Mr. Rollings:
A final inspection of the above referenced project has been confirmed by representatives of the
City of Coppell. The drainage, utility and paving construction has been verified and is in
compliance with the City of Coppell standard requirements. Erosion protection should be
maintained until bond expiration.
The one-year maintenance bonds and as-built drawings have been received from the contractor.
Maturity on the bonds will be one year from the date of the June 28, 1994 final acceptance
letter. The maturity on the Erosion Control Bond will be two years from the date of the June
28, 1994 final acceptance letter.
Construction Inspector
cc: Greg Jones, Chief Building Official
Howard Pafford, Water and Sewer Superintendent
Per Birdsall, Interim Street Superintendent
left Jones, Fire Marshal
file/Ida¥is/finalacc.ltr