Loading...
River Ridge Add-CS 951110November 10, 1995 Mr. Robert Rollings RBR Properties, Inc. 13760 Noel Road Suite 620 Dallas, Texas 75240-4320 RE: River Ridge Subdivision Final Acceptance Dear Mr. Rollings: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell. The drainage, utility and paving construction has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection should be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of the June 28, 1994 final acceptance letter. The maturity on the Erosion Control Bond will be two years from the date of the June 28, 1994 final acceptance letter. Construction Inspector cc: Greg Jones, Chief Building Official Howard Pafford, Water and Sewer Superintendent Per Birdsall, Interim Street Superintendent left Jones, Fire Marshal file/Ida¥is/finalacc.ltr