September 25, 1989
¢~v o~ ~op~l~
255 P)/14<way Blvd.
Cop/~ell, Te~ 7~}19
Re: Shadow W .oods Estates - Alley A-1
NDM No.: 88-10-116
Dear Russell:
As we have discussed, several existing fences are encroaching into the above referenced fight-of-way.
Please accept this letter as a formal request to deal with this situation by modifying the pavement
design adjacent to the fence, as shown on the enclosed prints. We propose to approach this as a field
change to be reflected on the "Record Drawings" filed subsequent to the completion of construction.
Please let us know your opinion regarding this matter.
Sincerely,
NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
Michael Daniel
CMD/rdp
Steve Gomm - Public Works Dept.
Dale Jackson -- Building Inspection Dept.