Loading...
River Ridge Add-CS 940628 ,"-~=.'"~==~1 I/'~ .'~,1'~ ,~ /~t '~I ..... -":'~.,-- I I~._ j L_ ,___~ ~ Y.' .---/ i ~ II ~ /~ ~, ~ ~~~- P.O. Box 478 ~/ /~) The City With A Beautiful Future Coppe,l. Texas 75019 ~ ~/ /~ ./ 214-462-0022 June 28, 1994 Mr. Robert Rollings RBR Properties, Inc. 13760 Noel Road Suite 620 Dallas, Texas 75240-4320 RE: River Ridge Final Acceptance Phase I (Lots 1-12, Blk A, Lots 1-5 & 19-22, Blk B, Lots 1-9, Blk C) Dear Mr. Rollings: A final inspection of the above referenced project has been confirmed by representatives of the City of Coppell subject to various agreements. In reference to your June 28, 1994 letter to Ken Griffin, building permits may be issued on Phase I. The drainage, utility and paving construction has been verified and is in compliance with the City of Coppell standard requirements. Erosion protection should be maintained until bond expiration. The one-year maintenance bonds and as-built drawings have been received from the contractor. Maturity on the bonds will be one year from the date of this letter. The maturity on the Erosion Control Bond will be two years from the date of this letter. Sincerely, ,..,- Larry Davis Construction Inspector cc: Site Concrete, Mike Boney Patco Utilities.. John Skinner CCM, Jeff Crannell, P.E. · I Greg Jones, Chief Building Official Howard Pafford, Water and Sewer Superintendent Rey Gonzales, Street Superintendent Troy Glidewell. Fire Marshal · -~': ~} ._ R.B.R. Properties, Inc. Rollings June 28, 1994 Mr. Ken Griffin Engineering Department City of Coppell Coppell Town Center ,~. 255 Parkway Blvd. . Coppell, Texas 75019 RE: River Ridge Addition - Coppell, Texas Dear Mr. Griffin, Pursuant to our meeting yesterday, please accept this letter as our written request that you release for building permits the following lots in the above referenced development shown on the enclosed plat as Phase I' LOT RI OCK LOT RI OCK 1 A 4 B 2 A 5 B 3 A 19 B 4 A 20 B 5 ^ 21 B 6 A 22 B 7 A I C 8 A 2 C 9 A 3 C 10 A 4 C 11 A 5 C 12 A 6 C 1 B 7 C 2 B 8 C 3 B 9 C 137~)0 Noel Rd. · Suite 620 · Dolles, TX 75240-43~)0 · (214) 788-1801 · Fox (214) 788-0798 With these thirty (30) lots in Phase I, it is also understood that three (3) of the remaining lots (Phase II) will be released for building permits. These additional lots will not be among those lots that abut the T.U. Electric land that forms the western boundary of our project. We will keep you apprised as to the status of our negotiations with T.U. Electric concerning maintenance of the slope along our western boundary. Thank you for your assistance in getting this project approved. Sincerely, R.B.R. PROPERTIES, INC. Robert B. Rollings President